InvestSMART

Wildcat Resources Limited (ASX:WC8)

ALERT: Price-sensitive ASX Announcement for WC8
Current share price for WC8 : $0.505 0.135 (36.49%)+
Release
11 Feb 2026 9:43AM
Price at Release
$0.370
Full Release
download
Summary
Wildcat Resources Limited has announced the successful interception of spodumene across all holes at the Bolt Cutter Central project, part of its Tabba Tabba Project in Western Australia. This marks a significant development as the area had not seen meaningful exploration prior. The Bolt Cutter Central features pegmatites that trend northwest and host spodumene, confirmed by XRD analysis. The company plans to continue exploration with additional RC and diamond drilling, complemented by metallurgical testing and environmental studies. These efforts are aimed at advancing the site towards a maiden mineral resource estimate.
Key Points
  • Wildcat Resources Limited owns 100% of the Tabba Tabba Project mining leases and LCT rights to E45/6205.
  • The Bolt Cutter Central pegmatites are interpreted to form a NW trending swarm.
  • Spodumene is confirmed within the pegmatites at Bolt Cutter Central.
  • There were no significant prior explorations at Bolt Cutter Central before Wildcat's involvement.
  • Drilling at Bolt Cutter Central is scheduled to continue with RC and diamond drilling.
  • Initial metallurgical testwork and environmental studies are ongoing at Bolt Cutter Central.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should refer to the full announcement here for further information.