Estrella Resources Limited has reported significant progress at its Ira Miri Manganese Project in Timor-Leste. The completion of the Category B market appraisal sample revealed a manganese stockpile inventory of 27,371 tonnes, including 4,984 tonnes of high-grade material. In-situ sampling confirmed high-grade mineralisation of up to 60.22% Mn. The company is advancing shipment preparations and pursuing larger geophysical surveys to explore further mineralisation potentials. Estrella's local operating experience and established relationships enhance its strategic position in Timor-Leste, with ongoing efforts to refine product specifications and obtain necessary export approvals.
Key Points
Completion of Ira Miri Category B market appraisal sample with a surveyed manganese stockpile inventory of 27,371 tonnes, including 4,984 tonnes of high-grade material.
In-situ ultra high-grade manganese mineralisation confirmed up to 60.22% Mn in pit sampling.
Product options identified across high, medium, and low-grade stockpiles, with optimal pre-shipment product specification studies underway.
Mineralisation remains open below the current pit floor and into pit walls, with untested high-priority IP anomalies at depth.
Shipment preparation progressing, with export and trans-shipment approvals advancing.
Larger Res/IP geophysical surveys planned to test the scale and depth extent of mineralisation.
Direct pit exposure has improved understanding of the Ira Miri manganese system, confirming structurally complex hosts.
Estrella's strong position in Timor-Leste due to local operating experience and established relationships.
Next steps include DSO shipment preparation, product QA/QC, IMSBC compliance, and further geophysics and drilling.
The Ira Miri project represents Estrella's first-mover position in Timor-Leste.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should refer to the full announcement here for further information.