InvestSMART

Element 25 Limited (ASX:E25)

ALERT: Price-sensitive ASX Announcement for E25
Current share price for E25 : $0.230 -0.16 (-41.03%)+
Release
22 Oct 2025 9:43AM
Price at Release
$0.390
Full Release
download
Summary
Element 25 Limited announced the appointment of Perth-based Altris Engineering to lead the expansion project of its Butcherbird Manganese Mine in Western Australia. This project, known as the Butcherbird Expansion Project (BBX), aims to increase the production capacity to 1.1 million tonnes per annum of manganese oxide concentrate. The expansion is part of Element 25's strategy to produce high-purity manganese sulphate monohydrate (HPMSM) for battery-grade applications at a planned facility in Louisiana, USA. The integration with Altris Engineering is expected to streamline the engineering design and project execution, supported by a strong financial backing from recent share placements and a loan facility from the Northern Australia Infrastructure Facility.
Key Points
  • Element 25 initiates detailed engineering design for Butcherbird Expansion Project.
  • Altris Engineering appointed as lead engineering consultant.
  • Targeted production increase to 1.1 million tonnes per annum of manganese oxide concentrate.
  • Project to support Element 25's HPMSM production facility in Louisiana, USA.
  • Recent financial backing includes a $10 million placement and a $50 million loan facility.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should refer to the full announcement here for further information.