Dalaroo Metals Ltd (ASX: DAL) announced that the first two holes from its maiden reverse circulation drilling program at the Wilfred target within the Bondoukou Gold Ridge Project in Côte d’Ivoire delivered a high-grade gold discovery, with BDRC002 returning 18 m at 7.31 g/t Au from 63 m, including 12 m at 8.66 g/t Au and a peak 1 m assay of 15.90 g/t Au, plus a second zone of 16 m at 1.46 g/t Au from 113 m, while BDRC001 returned 23 m at 2.14 g/t Au from surface including 12 m at 3.35 g/t Au; the results represent the first drilling ever undertaken across the approximately 7 km Gold Ridge corridor and validate Dalaroo’s targeting model built from magnetic data, artisanal workings, mapping, soil sampling and auger drilling. The high-grade interval in BDRC002 is associated with strongly silicified volcaniclastic rocks with quartz-sulphide veining and pyrite, providing an important geological vector for follow-up work, while BDRC001 shows broad oxide gold from surface that may reflect weathered primary mineralisation. At the time of reporting, nine holes for 1,750 m had been completed and BDRC010 was in progress as part of a 24-hole, approximately 4,200 m orientation phase within a larger 102-hole, approximately 12,000 m maiden program targeting Wilfred, Mag and Ali, with Dalaroo able to earn up to an 80% interest in permit PR-825 through a joint venture with Goldridge SARL; true widths, geometry and continuity remain unknown, but the company considers the early drilling success a significant step toward defining the scale potential of the broader corridor.
Key Points
Maiden drilling at the Wilfred target delivered a standout intercept of 18 m at 7.31 g/t Au from 63 m in hole BDRC002.
BDRC002 also returned a second mineralised interval of 16 m at 1.46 g/t Au from 113 m.
BDRC001 returned 23 m at 2.14 g/t Au from surface, demonstrating broad oxide gold mineralisation.
The 18 m high-grade zone in BDRC002 is hosted in strongly silicified volcaniclastic rock with quartz-sulphide veining and pyrite.
The first two holes were drilled in opposing directions and both intersected gold mineralisation.
The reported 18 m at 7.31 g/t Au interval represents about 132 gram-metres, while the 23 m at 2.14 g/t Au surface interval represents about 49 gram-metres.
These are the first drill holes ever completed along the approximately 7 km Gold Ridge corridor.
The drilling results validate a targeting model based on magnetics, artisanal workings, geological mapping, soil geochemistry and auger drilling.
The Bondoukou Gold Ridge Project is located in north-eastern Côte d’Ivoire within permit PR-825, where Dalaroo may earn up to 80%.
At the reporting date, nine RC holes for 1,750 m had been completed and BDRC010 was underway.
The current work forms part of a 24-hole, approximately 4,200 m orientation phase within a larger 102-hole, approximately 12,000 m maiden RC program.
Follow-up drilling is planned to test strike, depth, geometry and continuity at Wilfred and across the broader Mag, Wilfred and Ali targets.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should refer to the full announcement here for further information.