InvestSMART

Albright Metals Ltd (ASX:ABR)

ALERT: Price-sensitive ASX Announcement for ABR
Current share price for ABR : $0.003 -0.001 (-25%)+
Release
11 Mar 2026 9:14AM
Price at Release
$0.004
Full Release
download
Summary
Albright Metals Ltd announced the results from the second batch of diamond core drill samples from the Vail Road Gold Deposit at the Golden Pike Project. The results confirmed high-grade gold mineralization, with significant intercepts including 6.27m at 33.74 g/t Au and 2.57m at 70.66 g/t Au in the Middle Zone. These findings will contribute to an updated Mineral Resource Estimate under the JORC code. The Vail Road drilling, conducted in November and December 2025, aimed to test the continuity of mineralization in the Main, Middle, and Parallel Zones. The successful drill program aligns with Albright Metals' strategic objectives for resource estimation and mine development studies.
Key Points
  • Second batch of assays received for 2025 drilling at Vail Road Gold Deposit.
  • High-grade gold intercepts in Main, Middle, and Parallel Zones.
  • Best intercept: VR-25-77 with 2.33m at 24.81 g/t Au.
  • Drilling supports continuity of mineralization to the surface.
  • Mineral Resource Estimate to be updated under JORC code.
  • Drilling program included 1,020.5 metres of HQ core.
  • Drill results verify historical grade tenors.
  • Albright Metals aims for rapid progression to mine development studies.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should refer to the full announcement here for further information.