| Element 25 Limited (E25) ORDINARY FULLY PAID |
Materials |
$67 |
Annual Report to shareholders
|
28 Sep 2026 9:48AM |
$0.230 |
$0.205 |
fallen by
10.87%
|
|
| Western Gold Resources Limited (WGR) ORDINARY FULLY PAID |
Materials |
$22 |
Extension of Secured Non-dilutive $3 Million Loan Facility
|
28 Sep 2026 9:47AM |
$0.074 |
$0.073 |
fallen by
1.35%
|
|
| Wildcat Resources Limited (WC8) ORDINARY FULLY PAID |
Materials |
$335 |
Application for quotation of securities - WC8
|
28 Sep 2026 9:46AM |
$0.290 |
$0.210 |
fallen by
27.59%
|
|
| Impact Minerals Limited (IPT) ORDINARY FULLY PAID |
Materials |
$15 |
Final Director's Interest Notice
|
28 Sep 2026 9:46AM |
$0.026 |
$0.025 |
fallen by
3.85%
|
|
| Micro-X Limited (MX1) ORDINARY FULLY PAID |
Health Care |
$36 |
MX1 - DHS CT Baggage Scanner Contract Extension
|
28 Sep 2026 9:46AM |
$0.045 |
$0.048 |
risen by
5.56%
|
|
MX1 - Price-sensitive ASX Announcement
Full Release
Key Points
- Micro-X received a US$0.75 million contract extension from DHS S&T, equivalent to about A$1.05 million.
- The extension adds eight months to Micro-X’s existing Self-Screening Checkpoint contract.
- Funding will be used to design, build and deliver an upgraded Miniaturised CT Baggage Scanner.
- The upgraded scanner is intended to improve imaging speed and passenger throughput.
- The program includes redesigning the scanner for easier and more cost-effective manufacturing at scale.
- The work also aims to simplify deployment and operation based on prototype testing outcomes.
- Micro-X delivered its first prototype scanner to DHS in 2024 and later built three additional prototypes.
- The prototype scanners have been tested successfully and used to capture images from thousands of test bags.
- The Miniaturised CT Baggage Scanner is the core enabling technology for the Passenger Self-Screening Checkpoint.
- Micro-X believes the scanner also has potential as a standalone security screening product for airports and other settings.
- The scanner is built on Micro-X’s proprietary NEX Technology, which supports a smaller and simpler CT design than conventional systems.
- The announcement indicates continued US Government support for Micro-X’s security technology commercialisation pathway.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Kogan.com Ltd (KGN) ORDINARY FULLY PAID |
Consumer Discretionary |
$355 |
Update - Dividend/Distribution - KGN
|
28 Sep 2026 9:46AM |
$3.250 |
$3.720 |
risen by
14.46%
|
|
| Paradigm Biopharmaceuticals Limited (PAR) ORDINARY FULLY PAID |
Health Care |
$153 |
Continuation of Voluntary Suspension
|
28 Sep 2026 9:45AM |
$0.245 |
$0.245 |
fallen by
0%
|
|
| Mayne Pharma Group Limited (MYX) ORDINARY FULLY PAID |
Health Care |
$203 |
Mayne Pharma announces legal settlement
|
28 Sep 2026 9:45AM |
$2.810 |
$2.480 |
fallen by
11.74%
|
|
| Wildcat Resources Limited (WC8) ORDINARY FULLY PAID |
Materials |
$335 |
Application for quotation of securities - WC8
|
28 Sep 2026 9:44AM |
$0.290 |
$0.210 |
fallen by
27.59%
|
|
| Lindian Resources Limited (LIN) ORDINARY FULLY PAID |
Materials |
$721 |
Trading Halt
|
28 Sep 2026 9:44AM |
$0.595 |
$0.390 |
fallen by
34.45%
|
|
LIN - Price-sensitive ASX Announcement
Full Release
Key Points
- ASX placed Lindian Resources Limited securities in trading halt at the company’s request.
- The trading halt was requested pending clarification from the Government of Malawi.
- The clarification relates to proposed amendments to the Mines and Minerals Act 2023.
- The matter concerns Lindian’s Kangankunde project in Malawi.
- Related media speculation was also cited as a reason for the halt.
- The trading halt was to last until the earlier of 30 September 2026 normal trading or a market announcement.
- Lindian said it was not aware of any reason the trading halt should not be granted.
- The request was made under ASX Listing Rule 17.1.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| London City Equities Limited (LCE) ORDINARY FULLY PAID |
Financials |
$29 |
Change of Director's Interest Notice X 3
|
28 Sep 2026 9:43AM |
$0.850 |
$0.900 |
risen by
5.88%
|
|
| Red Sky Energy Limited (ROG) ORDINARY FULLY PAID |
Energy |
$11 |
Yarrow North 1 and Willowie 2 to Commence in October
|
28 Sep 2026 9:43AM |
$0.001 |
$0.001 |
fallen by
0%
|
|
ROG - Price-sensitive ASX Announcement
Full Release
Key Points
- Yarrow North 1 re-entry is scheduled to start in the second week of October 2026 following joint venture approval of the supplementary budget and AFE.
- Willowie 2 appraisal well in PRL 18 is scheduled to spud in the third week of October 2026.
- Yarrow 4 and Yarrow 5 both reached total depth and intersected gas pay in the Patchawarra Formation and Tirrawarra Sandstone.
- Yarrow 4 and Yarrow 5 have been cased and suspended as future producers pending stimulation and completion.
- Yarrow North 1 has been suspended since 2008 and is planned for re-entry, stimulation and tie-in to the Yarrow 1 flowline.
- First gas from Yarrow North 1 is targeted for early 2027.
- Willowie 2 is an appraisal well up-dip of Willowie 1 targeting the Patchawarra Formation and Tirrawarra Sandstone.
- No production testing has yet been carried out at Yarrow 4 or Yarrow 5, so flow rates and commercial deliverability are not yet known.
- Red Sky said fracture stimulation is important because the Yarrow reservoirs are tight and require stimulation to improve gas flow.
- Yarrow 1 previously reached initial ramp-up production of about 2.4 MMscf/d after re-entry and stimulation, above the AFE P50 expectation of 1.6 MMscf/d.
- Red Sky holds a 20% working interest in the Santos-operated Innamincka Dome Joint Venture.
- Red Sky was funded for its share of the current program, with A$6.17 million cash at 30 June 2026 and an estimated A$4.35 million share of program costs.
- Estimated Red Sky net costs were about A$0.6 million for Yarrow North 1 and A$1.75 million for Willowie 2, with Yarrow 4 and Yarrow 5 stimulation included in about A$2.0 million for the Yarrow program.
- Production from existing Yarrow wells continues to provide cash flow, including A$1.045 million in Yarrow receipts in the June 2026 quarter.
- Santos operates established gas-gathering, pipeline and processing infrastructure linking the project to the Moomba facility.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Mayne Pharma Group Limited (MYX) ORDINARY FULLY PAID |
Health Care |
$203 |
Date for Annual General Meeting
|
28 Sep 2026 9:42AM |
$2.810 |
$2.480 |
fallen by
11.74%
|
|
| Metrics Master Income Trust (MXT) ORDINARY UNITS FULLY PAID |
Financials |
$1,999 |
Pause in Trading
|
28 Sep 2026 9:42AM |
$1.755 |
$1.630 |
fallen by
7.12%
|
|
| OpenLearning Limited (OLL) ORDINARY FULLY PAID |
Information Technology |
$9 |
OLL Signs 5-year $1.75M Platform SaaS Agreement
|
28 Sep 2026 9:42AM |
$0.015 |
$0.011 |
fallen by
26.67%
|
|
OLL - Price-sensitive ASX Announcement
Full Release
Key Points
- OpenLearning signed a 5-year LMS SaaS agreement with one of the largest private education institutions in the Philippines.
- The contract commences on 1 July 2027.
- The total minimum contract value is approximately US$1.232 million, equivalent to about A$1.75 million.
- OpenLearning described it as its largest LMS SaaS agreement in the Philippines.
- Platform SaaS fees are based on the number of enrolled students at the institution.
- The agreement includes OpenLearning’s cloud-hosted LMS, generative AI assistant, AI course builder, outcomes-based assessment, learner portfolios, interactive learning tools and employability features.
- OpenLearning will also provide administrator and faculty training plus ongoing technical support.
- The agreement was signed on 25 September 2026 and finalised after 7:00pm AEST.
- Fees are lower in the first year and increase in later years.
- The announcement highlights OpenLearning’s growing momentum and expansion opportunities in the Philippines.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Metrics Income Opportunities Trust (MOT) ORDINARY UNITS FULLY PAID |
Financials |
$469 |
Pause in Trading
|
28 Sep 2026 9:41AM |
$1.620 |
$1.405 |
fallen by
13.27%
|
|
| Metrics Real Estate Multi-Strategy Fund (MRE) FULLY PAID UNITS STAPLED SECURITIES |
- |
$209 |
Pause in Trading
|
28 Sep 2026 9:41AM |
$1.680 |
$1.380 |
fallen by
17.86%
|
|
| Trajan Group Holdings Limited (TRJ) ORDINARY FULLY PAID |
Health Care |
$41 |
2026 Notice of Annual General Meeting
|
28 Sep 2026 9:41AM |
$0.260 |
$0.265 |
risen by
1.92%
|
|
| Impact Minerals Limited (IPT) ORDINARY FULLY PAID |
Materials |
$15 |
Managing Director to Step Down and Board Refresh
|
28 Sep 2026 9:40AM |
$0.026 |
$0.025 |
fallen by
3.85%
|
|
IPT - Price-sensitive ASX Announcement
Full Release
Key Points
- Dr Mike Jones stepped down as Managing Director for health reasons after 20 years of service.
- The change took effect on 25 September 2026.
- Dr Jones will remain involved in an advisory role to support continuity during the transition.
- Frank Bierlain and Paul Ingram will not stand for re-election at the AGM.
- Jim McKerlie will become Executive Chair during the search for a new CEO.
- The company is seeking leadership to advance its High Purity Aluminium production business.
- A comprehensive strategic review is being completed under Jim McKerlie.
- The board formally thanked Dr Jones, Paul Ingram and Frank Bierlain for their service.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Cambium Bio Limited (CMB) ORDINARY FULLY PAID |
Health Care |
$13 |
Date of AGM and Closing Date for Director Nominations
|
28 Sep 2026 9:39AM |
$0.550 |
$0.450 |
fallen by
18.18%
|
|
| GenusPlus Group Ltd (GNP) ORDINARY FULLY PAID |
Industrials |
$1,550 |
Application for quotation of securities - GNP
|
28 Sep 2026 9:39AM |
$9.280 |
$7.615 |
fallen by
17.94%
|
|
| BSA Limited (BSA) ORDINARY FULLY PAID |
Industrials |
$14 |
Suspension from Quotation
|
28 Sep 2026 9:37AM |
$0.275 |
$0.175 |
fallen by
36.36%
|
|
BSA - Price-sensitive ASX Announcement
Full Release
Key Points
- ASX suspended BSA Limited's securities from quotation immediately on 28 September 2026 under Listing Rule 17.2.
- The suspension followed BSA's request for a voluntary suspension pending a market announcement.
- BSA said the pending announcement related to a material acquisition.
- BSA expected to release the acquisition announcement on or before market open on Wednesday, 30 September 2026.
- The suspension would remain until the earlier of the end of the requested period or the release of the announcement.
- BSA confirmed it was not aware of any reason the voluntary suspension should not be granted.
- The request was authorised by BSA's Board of Directors.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Austral Gold Limited (AGD) ORDINARY FULLY PAID |
Materials |
$84 |
Austral Gold Intersects 95 m at 1.10 g/t AuEq at Guanaco
|
28 Sep 2026 9:36AM |
$0.150 |
$0.125 |
fallen by
16.67%
|
|
AGD - Price-sensitive ASX Announcement
Full Release
Key Points
- Austral Gold released initial drilling results from the Los Nanos sector at its 100%-owned Guanaco Mine in Chile.
- The announcement date is 28 September 2026.
- The drilling programme comprised 23 reverse circulation holes for a total of 1,128 metres.
- The standout result was hole RC-1186 with 95 m at 1.10 g/t AuEq including 3 m at 8.11 g/t AuEq.
- Additional strong intercepts included RC-1197 at 20 m at 3.12 g/t AuEq and RC-1196 at 15 m at 3.33 g/t AuEq.
- Twenty of the 23 holes returned significant results.
- Results indicate continuity of mineralisation within the existing Los Nanos Mineral Resource.
- Drilling also intersected mineralisation beyond the current resource model.
- Austral said the widest mineralised zones appear where EW to ENE structures intersect NW-trending structures.
- Los Nanos is located about 2.5 km from the Guanaco processing plant and existing infrastructure.
- Los Nanos hosts the highest-grade Mineral Resource within Guanaco’s open-pit inventory but is not currently in reserves or the life-of-mine plan.
- The company plans to update its three-dimensional geological and structural model using the new drilling data.
- A follow-up drilling phase of up to 8,000 metres in more than 40 holes is planned for Q4 2026.
- The reported AuEq calculation used Au plus Ag divided by 90.91 based on stated metal prices.
- QA/QC procedures and internal laboratory checks were reported as acceptable and assay results were considered reliable.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Eagers Automotive Limited (APE) ORDINARY FULLY PAID |
Consumer Discretionary |
$5,652 |
Update - Notification of buy-back - APE
|
28 Sep 2026 9:35AM |
$18.490 |
$20.040 |
risen by
8.38%
|
|
| Nex Metals Exploration Limited (NME) ORDINARY FULLY PAID |
Materials |
$4 |
New Eastern Goldfields tenement applications and update
|
28 Sep 2026 9:35AM |
$0.014 |
$0.013 |
fallen by
7.14%
|
|
NME - Price-sensitive ASX Announcement
Full Release
Key Points
- 12 new exploration licence applications were lodged across the Keith–Kilkenny Trend covering 1,946.7 km².
- All 12 new Keith–Kilkenny tenement applications are pending grant and do not currently confer exploration rights.
- The East Scotia tenements currently being acquired comprise 135.1 km² of live tenure.
- The previously announced North Scotia applications cover 737.9 km² and remain pending grant.
- If successful, East Scotia, North Scotia and Keith–Kilkenny tenure would total 2,819.7 km².
- Including West Point, the broader Nex-Wongatha joint venture portfolio could total 3,003.1 km².
- The Keith–Kilkenny areas were selected based on granite, granodiorite, associated greenstones and regional structural features identified from public datasets.
- The joint venture undertook reconnaissance and preliminary geochemical work at East Scotia.
- Portable XRF testing was completed on four rock specimens from E24/223 at East Scotia.
- Historical multi-element data from three drill intervals at 59 m, 90 m and 130 m were reviewed for comparative geological purposes.
- Variations in K/Rb, K/Ba and Rb/Sr ratios were identified as possible alteration-screening indicators, but not as evidence of gold mineralisation.
- NME cautioned that portable XRF data is only a reconnaissance tool and not a substitute for laboratory analysis.
- The four East Scotia specimens have been submitted to ALS for 76-element laboratory analysis, with results to be reported separately.
- Future exploration, subject to grants and approvals, is expected to include historical data validation, geophysics, mapping, structural interpretation, surface geochemistry and potentially drilling.
- The announcement notes the joint venture with Wangkatja Tjungula Aboriginal Corporation as the platform through which these Western Australian gold opportunities are being pursued.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.