Perpetual Resources Limited (PEC) ORDINARY FULLY PAID |
Materials |
$12 |
High-Grade Rare Earth Discovery at Raptor Project
|
15 Aug 2024 8:45AM |
$0.010 |
$0.014 |
risen by
40%
|
|
PEC - Price-sensitive ASX Announcement
Full Release
Key Points
- Perpetual Resources Ltd announces high-grade rare earth discovery from their maiden drill program at the Raptor REE Project.
- Initial drill results confirm high TREO grades at depth, with substantial Nd+Pr oxides.
- Standout drill intercepts include 12m @ 4,601ppm TREO, 7m @ 4,240ppm TREO, and 10m @ 2,547ppm TREO.
- All holes show mineralization starting at surface and continuing at depth, suggesting potential depth continuity.
- The results indicate that the Raptor REE Project could be among the best Caldeira-style clay-hosted REE exploration opportunities.
- Additional drill results are expected later in August to assist in planning for deeper drilling programs.
- Perpetual Resources is active in exploring lithium and rare earth elements in the Minas Gerais region of Brazil.
- The Raptor Project is located within the Cretaceous Alkaline Complex of Poços de Caldas, Brazil, known for its high-grade ionic clay REE deposits.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
D3 Energy Limited (D3E) ORDINARY FULLY PAID |
Energy |
- |
Production Testing Commences at RBD10
|
15 Aug 2024 8:43AM |
$0.170 |
$0.060 |
fallen by
64.71%
|
|
D3E - Price-sensitive ASX Announcement
Full Release
Key Points
- D3 Energy Limited has announced the commencement of production testing at RBD10 in the Free State, South Africa.
- The RBD10 test follows a successful RBD03 test that flowed at an average rate of 147 Mscfd.
- D3 Energy has designed and manufactured accurate metering equipment for the testing, conforming to API and AGA standards.
- The company aims to see an increase in rates at RBD10 similar to those at RBD03.
- Completion of the RBD10 testing will be followed by drilling at RBD12.
- The results of these tests will inform the design of further testing programs and planning for a Production Right application in South Africa.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Orpheus Uranium Limited (ORP) ORDINARY FULLY PAID |
Materials |
$8 |
Notification regarding unquoted securities - ORP
|
15 Aug 2024 8:43AM |
$0.052 |
$0.029 |
fallen by
44.23%
|
|
Pilbara Minerals Limited (PLS) ORDINARY FULLY PAID |
Materials |
$4,441 |
Proposed issue of securities - PLS
|
15 Aug 2024 8:41AM |
$2.850 |
$1.380 |
fallen by
51.58%
|
|
Eureka Group Holdings Limited (EGH) ORDINARY FULLY PAID |
Real Estate |
$212 |
Appointment of CEO and Board Change
|
15 Aug 2024 8:40AM |
$0.533 |
$0.500 |
fallen by
6.10%
|
|
EGH - Price-sensitive ASX Announcement
Full Release
Key Points
- Simon Owen appointed as CEO effective 12 September 2024
- John Whiteman appointed as Independent Non-Executive Director effective 2 September 2024
- Simon Owen has over 25 years of experience in property and retirement living businesses
- Simon Owen led Ingenia Communities Group to grow its market cap from $30 million to $1.7 billion
- Simon Owen will participate in a $1.5 million share placement at $0.5222 per share
- Murray Boyte will transition from Executive Chairman to Non-Executive Chairman
- John Whiteman has extensive experience in Australian equities markets and funds management
- Simon Owen's remuneration package includes $400,000 annual salary, options, and participation in STI and LTI plans
- Simon Owen's employment includes a change in control bonus and post-employment restraints
- Full year results for FY2024 will be announced on 28 August 2024
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Alderan Resources Limited (AL8) ORDINARY FULLY PAID |
Materials |
$5 |
Proposed issue of securities - AL8
|
15 Aug 2024 8:39AM |
$0.003 |
$0.026 |
risen by
766.67%
|
|
Artemis Resources Limited (ARV) ORDINARY FULLY PAID |
Materials |
$15 |
High Grade Gold Vein Discovery at Titan Prospect
|
15 Aug 2024 8:38AM |
$0.010 |
$0.006 |
fallen by
40%
|
|
ARV - Price-sensitive ASX Announcement
Full Release
Key Points
- High grade gold reported in veins at Titan prospect
- Titan prospect tracked for approximately 700m and remains open
- Rock chip samples report high grade gold assay results exceeding 10,000 g/t Au
- Copper assay results include values up to 23.8% Cu
- A 10.4 oz gold bar was produced from material extracted from Titan prospect
- Ground reconnaissance program delivered further gold occurrences
- Mapping of prospective surface veins and fertile structures identified
- Potential for large scale regional discovery
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Enero Group Limited (EGG) ORDINARY FULLY PAID |
Communication Services |
$64 |
Enero 2024 Key Dates
|
15 Aug 2024 8:37AM |
$1.265 |
$0.705 |
fallen by
44.27%
|
|
Gladiator Resources Limited (GLA) ORDINARY FULLY PAID |
Materials |
$5 |
Drilling results update for Mkuju Uranium Project, Tanzania
|
15 Aug 2024 8:37AM |
$0.014 |
$0.007 |
fallen by
50%
|
|
GLA - Price-sensitive ASX Announcement
Full Release
Key Points
- Fifth hole at SWC reveals high-grade surface uranium, over 3000ppm eU3O8.
- SWC-Mtonya is part of a 12km+ corridor with widespread uranium mineralization.
- Drill-hole at the southern end of Mtonya shows mineralized intervals.
- Drilling at Likuyu North targeting a 6.5km area on-trend of an existing 4.6Mlb U3O8 deposit.
- Planned comprehensive roll-front system targeting program.
- SWC drilling completed with notable uranium intervals in holes.
- Henri Prospect at Mtonya drilled showing multiple uranium levels.
- Ground magnetic survey processing at Likuyu North completed.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Aurizon Holdings Limited (AZJ) ORDINARY FULLY PAID |
Industrials |
$5,302 |
Appendix 3Y change of Directors interest notice
|
15 Aug 2024 8:37AM |
$3.370 |
$2.990 |
fallen by
11.28%
|
|
Enero Group Limited (EGG) ORDINARY FULLY PAID |
Communication Services |
$64 |
FY24 Results Presentation
|
15 Aug 2024 8:36AM |
$1.265 |
$0.705 |
fallen by
44.27%
|
|
EGG - Price-sensitive ASX Announcement
Full Release
Key Points
- Net revenue for Enero Group declined by 6% on a like-for-like basis to $189.7 million, reflecting strong Australian performance but challenging international technology and ad tech markets.
- Enero Group's EBITDA declined by 10% on a like-for-like basis to $37.4 million with cost initiatives implemented in Q4.
- NPAT increased 7% on a like-for-like basis to $10.3 million, reflecting lower interest expense and higher profits in wholly owned businesses.
- Earnings per share (EPS) grew by 8% on a like-for-like basis.
- Final dividend of 2.0 cents per share fully franked, with a payout ratio of 51%.
- Free cash flow was $21.7 million with 88% cash conversion demonstrating strong working capital management.
- Economic interest basis results show a 15.5% decline in net revenue to $167.1 million and a 7.1% decline in EBITDA to $25.9 million.
- Significant items included a $70.8 million impairment loss relating to ROI DNA and GetIT intangibles, and a $22.4 million fair value gain on contingent consideration.
- The group showed strong capital position with net cash of $38.2 million and $47 million of an undrawn $50 million bank loan facility.
- Balanced approach to capital management with zero leverage and substantial share buybacks.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Dimerix Limited (DXB) ORDINARY FULLY PAID |
Health Care |
$330 |
Notification of Date of 2024 AGM
|
15 Aug 2024 8:36AM |
$0.440 |
$0.570 |
risen by
29.55%
|
|
eNova Mining Limited (ENV) ORDINARY FULLY PAID |
Materials |
$11 |
CODA Geochem. sampling reveals high-grade REE mineralisation
|
15 Aug 2024 8:36AM |
$0.008 |
$0.008 |
fallen by
0%
|
|
ENV - Price-sensitive ASX Announcement
Full Release
Key Points
- High-grade REE mineralisation confirmed in CODA tenements.
- Peak REE assays reached up to 5,481 ppm TREO.
- High titanium content with a maximum assay of 16.36% TiO2.
- Geochemical sampling includes channel and pit samples.
- Exploration strategy focuses on deeper, weathered clay layers.
- Initial findings suggest extensive mineral resources potential.
- Ongoing drilling programs aim to expand high-grade zones.
- Sustainable exploration practices are emphasized.
- Kamafugite clay layers identified as significant geological context.
- Metallurgical characterisation work continues for Charley Creek project.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Enero Group Limited (EGG) ORDINARY FULLY PAID |
Communication Services |
$64 |
FY24 Results Announcement
|
15 Aug 2024 8:35AM |
$1.265 |
$0.705 |
fallen by
44.27%
|
|
EGG - Price-sensitive ASX Announcement
Full Release
Key Points
- Enero Group reported a 7% like-for-like increase in net profit for FY24.
- Net revenue declined by 6% on a like-for-like basis to $189.7 million.
- EBITDA declined by 10% on a like-for-like basis to $37.4 million.
- Statutory net loss after tax to equity holders was $44.2 million due to a significant non-cash impairment charge.
- Technology, Healthcare and Consumer Practice saw a 4% YoY decline in net revenue to $143.5 million.
- OBMedia's net revenue declined by 8% on a like-for-like basis to $46.2 million.
- The company maintained a strong cash balance of $46.7 million as of June 30, 2024.
- A final dividend of 2.0 cents per share, fully franked, was declared.
- Enero's buyback program completed with 2 million shares acquired.
- Outlook for FY25 includes continued cost management initiatives.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
ANZ Group Holdings Limited (ANZ) ORDINARY FULLY PAID |
Financials |
$85,456 |
Update - Notification of buy-back - ANZ
|
15 Aug 2024 8:35AM |
$28.730 |
$28.760 |
risen by
0.10%
|
|
Pilbara Minerals Limited (PLS) ORDINARY FULLY PAID |
Materials |
$4,441 |
Proposed issue of securities - PLS
|
15 Aug 2024 8:35AM |
$2.850 |
$1.380 |
fallen by
51.58%
|
|
Poseidon Nickel Limited (POS) ORDINARY FULLY PAID |
Materials |
- |
Extension of Entitlement Offer Closing Date
|
15 Aug 2024 8:34AM |
$0.004 |
$0.006 |
risen by
37.50%
|
|
POS - Price-sensitive ASX Announcement
Full Release
Key Points
- Poseidon Nickel Limited announced an extension of its entitlement offer closing date.
- The closing date for the non-renounceable entitlement offer is extended to 27 August 2024.
- The extension allows eligible shareholders more time to take up their entitlements.
- The entitlement offer seeks to raise up to $3,713,535 before costs.
- Eligible shareholders can subscribe for one share for every three shares held.
- The issue price is $0.003 per share with one free new option for every three shares applied for and issued.
- Each new option has an exercise price of $0.006 and a term of two years from the date of issue.
- An investor webinar was held on 15 August 2024 to discuss the announcement and provide additional information.
- Poseidon Nickel has significant nickel and gold resources and multiple projects in Western Australia.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Enero Group Limited (EGG) ORDINARY FULLY PAID |
Communication Services |
$64 |
Dividend/Distribution - EGG
|
15 Aug 2024 8:33AM |
$1.265 |
$0.705 |
fallen by
44.27%
|
|
Alderan Resources Limited (AL8) ORDINARY FULLY PAID |
Materials |
$5 |
Placement and Non-Renounceable Rights Issue to Raise $1.6m
|
15 Aug 2024 8:33AM |
$0.003 |
$0.026 |
risen by
766.67%
|
|
AL8 - Price-sensitive ASX Announcement
Full Release
Key Points
- Alderan Resources Limited (ASX: AL8) plans to raise $1.6 million through a placement and a non-renounceable pro-rata entitlement offer.
- The placement aims to raise $332,000 through the issuance of 166,000,000 new fully paid ordinary shares at $0.002 per share.
- Cygnet Capital Pty Limited acted as Lead Manager for the Placement and will receive a 6% fee of the funds raised.
- Proceeds from the Placement and Rights Issue will be used for exploration activities in the USA and Brazil and general working capital.
- The company also proposes a non-renounceable pro-rata entitlement offer to raise up to $1,272,861.
- Eligible shareholders can subscribe for one new share for every two shares held at $0.002 per share, with one attaching option for every four shares applied for, exercisable at $0.005 per option.
- The funds will support Stage 1 drilling at the New Years prospect within the Cactus copper-gold project in Utah, USA.
- Historical drill intersections at the New Years prospect include notable copper findings.
- The company plans to consolidate its capital on a 1-for-10 basis, subject to shareholder approval.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Enero Group Limited (EGG) ORDINARY FULLY PAID |
Communication Services |
$64 |
Preliminary Final Report
|
15 Aug 2024 8:32AM |
$1.265 |
$0.705 |
fallen by
44.27%
|
|
EGG - Price-sensitive ASX Announcement
Full Release
Key Points
- Gross revenues from ordinary activities increased by 8.7% to AUD 804,474,000.
- Net revenue decreased by 21.5% to AUD 189.7 million.
- EBITDA decreased by 52.6% to AUD 37.4 million with an EBITDA margin decrease from 32.6% to 19.7%.
- Loss after tax attributable to members was AUD 44,187,000.
- Impairment loss of AUD 70,827,000 recognized.
- Significant restructuring costs of AUD 4,539,000 incurred.
- Dividends paid included a final dividend for 2023 of 4.5 cents, an interim dividend for 2024 of 3.0 cents, and a final dividend for 2024 of 2.0 cents.
- No acquisitions in the year ended June 2024, but a sale of CPR Communications and Public Relations resulted in a loss of AUD 2,154,000.
- A contingent consideration fair value gain of AUD 22,421,000 was recognized.
- The company experienced a significant decline in net revenue in the USA and UK & Europe regions.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Monadelphous Group Limited (MND) ORDINARY FULLY PAID |
Industrials |
$1,716 |
Monadelphous Contracts Update
|
15 Aug 2024 8:32AM |
$11.750 |
$17.360 |
risen by
47.74%
|
|
MND - Price-sensitive ASX Announcement
Full Release
Key Points
- Monadelphous Group Limited announced the award of three new construction contracts
- The revenue contribution from these contracts is expected to total approximately $340 million
- Mondium, a joint venture with Lycopodium, secured a design and construct contract from Rio Tinto
- The project involves a new sampling facility at a port operation in Pilbara, Western Australia, to be completed by mid-2026
- Monadelphous was awarded a multidisciplinary construction contract under BHP’s WAIO Asset Panel Framework
- The project with BHP involves dewatering surplus water from Orebody 32 in Newman, WA, expected to be completed in the second half of 2025
- Zenviron, a joint venture with ZEM Energy, secured a contract for the Lotus Creek Wind Farm with CS Energy in Central Queensland
- Zenviron will collaborate with Vestas for civil, electrical works, and workers’ accommodation for the wind farm, expected to be completed by the end of 2027
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Adriatic Metals Plc (ADT) CHESS DEPOSITARY INTERESTS 1:1 |
Materials |
$1,298 |
Contractor Fatality
|
15 Aug 2024 8:30AM |
$2.670 |
$3.760 |
risen by
40.82%
|
|
Wellnex Life Limited (WNX) ORDINARY FULLY PAID |
Consumer Staple |
$16 |
Wellnex Receives Opening Order in the UK from Haleon
|
15 Aug 2024 8:29AM |
$0.023 |
$0.245 |
risen by
965.22%
|
|
WNX - Price-sensitive ASX Announcement
Full Release
Key Points
- Wellnex Life receives first Purchase Order for TGA registered paracetamol soft gel liquid analgesic for the UK market
- Expansion into the UK market builds on launches in Australia and the imminent launch in the UAE
- Haleon, a leading consumer healthcare company, partners with Wellnex Life for Panadol
- The UK market introduction is a significant milestone for Wellnex Life
- Validation of Wellnex Life’s business model of owning healthcare brands and IP
- Haleon's confidence in Wellnex Life's product is a testament to the company's innovative approach
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Genetic Technologies Limited (GTG) ORDINARY FULLY PAID |
Health Care |
$6 |
Global launch of geneType on EasyDNA platform
|
15 Aug 2024 8:29AM |
$0.041 |
$0.039 |
fallen by
4.88%
|
|
GTG - Price-sensitive ASX Announcement
Full Release
Key Points
- Global launch of geneTypeâ„¢ on EasyDNA platform
- Available in 42 countries
- Potential to expand on A$7.5m annual revenues
- Expected to achieve more than 70% gross margin
- Reduction of cash burn to under A$200k per month
- Streamlined online process for consumers and clinicians
- Telehealth-enabled access to clinical testing
- Data analysis to be carried out in Australian-based laboratory
- New initiative to streamline clinical questionnaire completion and result communication
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
Litchfield Minerals Limited (LMS) ORDINARY FULLY PAID |
Materials |
$3 |
Drilling confirms massive base metal sulphides, West Arunta
|
15 Aug 2024 8:29AM |
$0.115 |
$0.120 |
risen by
4.35%
|
|
LMS - Price-sensitive ASX Announcement
Full Release
Key Points
- Massive base metal sulphides intersected in LMRD004 from Silver King project area.
- Significant intercepts include 17m at 2.47% Pb, 1.06% Zn, and 15.7 g/t Ag from 49m.
- Widespread distribution of sulphides indicates potential for high-grade mineralisation.
- Upcoming tenement-wide VTEM survey planned for August.
- Further geological mapping and geochemical sampling to be conducted.
- Focus on identifying broader areas of sulphide distribution and potential trap sites.
- Twelve holes from the inaugural drilling campaign totalled 1,769m.
- Results suggest a promising future for the Mt Doreen project with high-grade polymetallic potential.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.