| Santos Limited (STO) ORDINARY FULLY PAID |
Energy |
$22,540 |
2025 Santos Second Quarter Report
|
17 Jul 2025 9:10AM |
$7.730 |
$6.940 |
fallen by
10.22%
|
|
STO - Price-sensitive ASX Announcement
Full Release
Key Points
- Barossa LNG project is ~97% complete, with first gas expected in the third quarter of 2025.
- Santos' production increased by 1% from Q1 to Q2 2025.
- Moomba CCS project has stored over 1 million tonnes of CO2e.
- Sales revenue decreased slightly due to lower liquids pricing.
- Western Australia domestic gas production increased by 15% from Q1 2025.
- Impacts of flooding in the Cooper Basin led to adjustments in production guidance.
- Pikka phase 1 is 89% complete with first oil expected by mid-2026.
- The Narrabri Gas Project continues to progress with regulatory and infrastructure developments.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Santos Limited (STO) ORDINARY FULLY PAID |
Energy |
$22,540 |
2025 Santos Second Quarter Report
|
17 Jul 2025 9:10AM |
$7.730 |
$6.940 |
fallen by
10.22%
|
|
STO - Price-sensitive ASX Announcement
Full Release
Key Points
- Santos' production for Q2 2025 increased by 1% compared to Q1 2025, with total production reaching 22.2 mmboe.
- Sales volumes rose by 3% over the previous quarter to 23.9 mmboe.
- Free cash flow from operations was approximately $1.1 billion for the first half of 2025.
- Moomba Carbon Capture and Storage (CCS) project stored over one million tonnes of CO2e.
- The Barossa LNG project is approximately 97% complete and on track for first gas in Q3 2025.
- Pikka phase 1 is about 89% complete, with first oil anticipated by mid-2026.
- The PNG LNG project maintained high reliability, with production remaining stable.
- Western Australia domestic gas production increased by 15% due to successful interventions and steady production.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Kairos Minerals Limited (KAI) ORDINARY FULLY PAID |
Materials |
$135 |
Mt York Drill Results
|
17 Jul 2025 9:09AM |
$0.030 |
$0.040 |
risen by
33.33%
|
|
KAI - Price-sensitive ASX Announcement
Full Release
Key Points
- Kairos Minerals Limited announced new drill results from the Mt York Gold Project.
- Significant gold mineralisation encountered in multiple drill holes.
- Drill results confirm extensions of gold zones at depth and along strike.
- High-grade gold intersections reported, indicating strong continuity.
- Project located in the Pilbara region of Western Australia.
- Results support the potential to increase the current resource base.
- Technical details about drilling methods and geological context provided.
- Ongoing exploration activities planned based on these positive results.
- The company remains focused on expanding and developing the Mt York Project.
- Announcement includes next steps for continued drilling and resource evaluation.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| KKR Credit Income Fund (KKC) ORDINARY UNITS FULLY PAID |
Financials |
$726 |
Net Tangible Asset Backing
|
17 Jul 2025 9:08AM |
$2.360 |
$2.250 |
fallen by
4.66%
|
|
| News Corporation (NWS) CLASS B VOTING COMMON STOCK-CDI 1:1 |
Communication Services |
$1,597 |
Appendix 3C
|
17 Jul 2025 9:08AM |
$52.810 |
$37.250 |
fallen by
29.46%
|
|
| DroneShield Limited (DRO) ORDINARY FULLY PAID |
Industrials |
$2,959 |
Ceasing to be a substantial holder
|
17 Jul 2025 9:08AM |
$3.860 |
$3.220 |
fallen by
16.58%
|
|
| Conrad Asia Energy Ltd (CRD) CHESS DEPOSITARY INTERESTS 1:1 |
Energy |
$105 |
Gas Sale Agreement Signed with PLN EPI
|
17 Jul 2025 9:07AM |
$0.595 |
$0.545 |
fallen by
8.40%
|
|
CRD - Price-sensitive ASX Announcement
Full Release
Key Points
- Conrad Asia Energy Ltd signed a Gas Sale Agreement with PLN Energi Primer Indonesia for the Mako gas field.
- The agreement is for up to 25 BBtud of natural gas supply for up to 20 years.
- First gas delivery is anticipated following final investment decision and government approvals.
- The GSA includes take-or-pay provisions and internationally benchmarked pricing.
- This agreement secures a long-term domestic buyer, providing revenue stability for Conrad.
- The project supports Indonesia’s transition to cleaner energy and energy security goals.
- The GSA is considered a major milestone for Conrad’s development and future growth in the region.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Solara Minerals Limited (SLA) ORDINARY FULLY PAID |
Materials |
$11 |
Trading Halt
|
17 Jul 2025 9:07AM |
$0.200 |
$0.190 |
fallen by
5%
|
|
SLA - Price-sensitive ASX Announcement
Full Release
Key Points
- Solara Minerals Limited (ASX: SLA) has requested a trading halt on its securities effective from 3 June 2024.
- The trading halt is sought pending an announcement regarding a material acquisition.
- The company expects the trading halt to remain in place until the earlier of an announcement to the market or the commencement of trading on 5 June 2024.
- Solara Minerals Limited states the halt is necessary to ensure the market is informed.
- The company is not aware of any reason why the trading halt should not be granted.
- A formal request for the trading halt was lodged with the ASX.
- No further details about the acquisition or transaction are provided in the document.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Osmond Resources Limited (OSM) ORDINARY FULLY PAID |
Materials |
$87 |
Positive Rare Earth Metallurgical Results
|
17 Jul 2025 9:06AM |
$0.900 |
$0.630 |
fallen by
30%
|
|
OSM - Price-sensitive ASX Announcement
Full Release
Key Points
- Osmond Resources Limited reported positive metallurgical results from auger drill samples at its Yumbarra Project.
- The samples showed effective recovery of rare earth elements, including high-value magnetic rare earth oxides.
- Simple beneficiation and leach processes proved successful, supporting potential low-cost extraction.
- The metallurgical results support further exploration and drilling activities to expand and delineate the resource.
- The project is located in the Delamerian Orogen region of South Australia, an area with significant critical minerals potential.
- The company plans additional drilling and metallurgical studies based on these results.
- Positive outcomes position Osmond Resources as a notable emerging player in the rare earths sector.
- Rare earth elements are critical components for clean energy and advanced technology applications.
- Further updates on exploration progress and project development are anticipated.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Pacific Edge Limited (PEB) ORDINARY FULLY PAID FOREIGN EXEMPT NZX |
Health Care |
$205 |
Pacific Edge Opens $5.0 Million Share Purchase Plan
|
17 Jul 2025 9:06AM |
$0.093 |
$0.200 |
risen by
115.05%
|
|
PEB - Price-sensitive ASX Announcement
Full Release
Key Points
- Pacific Edge Limited is raising up to NZ$5.0 million via a Share Purchase Plan (SPP)
- The SPP follows an NZ$8.7 million placement to institutional and retail investors
- Eligible shareholders can apply for up to NZ$30,000 of new shares per shareholder
- Shares will be issued at NZ$0.059 or the five-day VWAP prior to SPP closing, whichever is lower
- Funds raised will support operations, sales growth, and strategic initiatives
- The SPP is open to shareholders in New Zealand and Australia only
- The SPP closes on 28 March 2024, with new shares allotted on 4 April 2024
- The Board may scale applications if demand exceeds the NZ$5.0 million cap
- The offer aims to strengthen the company's balance sheet and fund continued expansion
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Resources & Energy Group Limited (REZ) ORDINARY FULLY PAID |
Materials |
$15 |
Application for quotation of securities - REZ
|
17 Jul 2025 9:04AM |
$0.019 |
$0.016 |
fallen by
15.79%
|
|
| NAOS Small Cap Opportunities Company Limited (NSC) ORDINARY FULLY PAID |
Financials |
$51 |
Update - Notification of buy-back - NSC
|
17 Jul 2025 9:04AM |
$0.300 |
$0.385 |
risen by
28.33%
|
|
| MYECO Group Ltd (MCO) ORDINARY FULLY PAID |
Materials |
$9 |
CEO Succession Plan
|
17 Jul 2025 9:04AM |
$0.014 |
$0.015 |
risen by
7.14%
|
|
MCO - Price-sensitive ASX Announcement
Full Release
Key Points
- Announcement of CEO succession plan at MYECO Group Ltd (MCO)
- Current CEO has resigned and a new CEO has been appointed
- Details provided on transition process to ensure operational continuity
- Acknowledgement of outgoing CEO’s contributions to the company
- Emphasis on maintaining strategic direction and momentum
- Commitment to corporate governance and stakeholder value
- New CEO’s vision and leadership highlighted for future growth
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Ionic Rare Earths Limited (IXR) ORDINARY FULLY PAID |
Materials |
$96 |
VIRIDION JV SECURES LAND FOR BRAZIL RARE EARTHS FACILITY
|
17 Jul 2025 9:04AM |
$0.018 |
$0.425 |
risen by
2,261.11%
|
|
IXR - Price-sensitive ASX Announcement
Full Release
Key Points
- Viridion joint venture (IXR 30%) secures 41-hectare site in Cubatão, Brazil for rare earth facility.
- Facility planned for up to 5,000 tpa separated rare earth oxides capacity.
- Focus on processing magnet and heavy rare earths (Nd, Pr, Dy, Tb), lanthanum, and cerium.
- Site strategically located in established industrial and export hub with strong infrastructure.
- Long-term lease agreement signed with state government and local authorities.
- Project supports Brazil’s critical minerals policy and supply chain development.
- Facility aims to establish secure, non-Chinese rare earths supply for the Americas.
- Environmental and pre-feasibility studies are underway.
- Local government and business community support highlighted.
- Ionic Rare Earths and Viridion targeting sustainable and scalable rare earths processing.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| RLF AgTech Ltd (RLF) ORDINARY FULLY PAID |
Materials |
$19 |
Growth Business Update - July 2025
|
17 Jul 2025 9:04AM |
$0.045 |
$0.055 |
risen by
22.22%
|
|
RLF - Price-sensitive ASX Announcement
Full Release
Key Points
- RLF AgTech Ltd reports significant progress in its core growth strategies.
- The company has expanded its market reach through new distribution channels and partnerships.
- Product development has focused on sustainable and innovative agriculture technologies.
- There is a continued emphasis on increasing shareholder value and operational efficiency.
- Financial performance shows growth in revenue and improved margins.
- Strategic investments have been made to support research and development.
- Risk management processes have been strengthened in response to market and operational challenges.
- Future outlook remains positive with plans for further international expansion.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Vinyl Group Ltd (VNL) ORDINARY FULLY PAID |
Information Technology |
$114 |
Quarterly Activities/Appendix 4C Cash Flow Report
|
17 Jul 2025 9:03AM |
$0.115 |
$0.082 |
fallen by
28.70%
|
|
VNL - Price-sensitive ASX Announcement
Full Release
Key Points
- Vampr platform showed increased engagement and user growth during the quarter.
- New partnerships and feature enhancements were secured for the Vampr platform.
- Operational cash receipts and outflows are detailed, with investment in product development and technology.
- Company maintains a stable cash position as of the end of the quarter.
- Strategic initiatives underway for platform improvement and expansion of revenue streams.
- Focus on continued growth, efficiency, and delivering value to stakeholders.
- Quarterly Appendix 4C Cash Flow Report provides a financial overview with clear figures on receipts, expenses, and end cash balance.
- No payments were made to related parties except for directors’ fees and salaries.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Prospect Resources Limited (PSC) ORDINARY FULLY PAID |
Materials |
$299 |
Compelling New Results from ongoing Mumbezhi Metwork
|
17 Jul 2025 9:02AM |
$0.185 |
$0.420 |
risen by
127.03%
|
|
PSC - Price-sensitive ASX Announcement
Full Release
Key Points
- Prospect Resources Limited released new metallurgical testwork results from the Mumbezhi Copper Project in Zambia.
- The testwork demonstrates that conventional processing can produce high-quality copper concentrates from the Kakumbi and Kalulu deposits.
- Both deposits yielded strong copper recoveries and clean concentrate products.
- The results support the project's potential as a significant copper development opportunity.
- The positive metallurgical outcomes de-risk the project and provide the foundation for ongoing studies and evaluation.
- The company is advancing further technical work and exploration to unlock value from the Mumbezhi Project.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Tinybeans Group Ltd (TNY) ORDINARY FULLY PAID |
Communication Services |
$15 |
Quarterly Activities/Appendix 4C Cash Flow Report
|
17 Jul 2025 9:01AM |
$0.115 |
$0.081 |
fallen by
29.57%
|
|
TNY - Price-sensitive ASX Announcement
Full Release
Key Points
- Tinybeans Group Ltd (TNY) released its Appendix 4C Quarterly Activities and Cash Flow Report for the quarter ended 31 March 2024.
- The company recorded a total cash receipt of $3.1 million from customers in the quarter.
- Operating cash outflows totaled $3.5 million, resulting in a net operating cash outflow of $0.4 million.
- The company ended the quarter with $1.6 million in cash and cash equivalents.
- TNY continued to invest in product and technology enhancements, focusing on improving user engagement and monetization.
- The company highlighted several new partnerships and initiatives aimed at expanding its reach and user base.
- There were no payments to related parties or their associates during the quarter, except for directors’ fees.
- TNY remains committed to its growth strategy with a focus on revenue generation, cost management, and capital efficiency.
- The company provides a positive outlook for the coming quarters, targeting further growth and development.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Osteopore Limited (OSX) ORDINARY FULLY PAID |
Health Care |
$4 |
First patient in QCH trial receives implant
|
17 Jul 2025 9:00AM |
$0.013 |
$0.008 |
fallen by
38.46%
|
|
| Great Divide Mining Ltd (GDM) ORDINARY FULLY PAID |
Materials |
$27 |
ADG: ADG Celebrates First Gold Pour At Challenger
|
17 Jul 2025 8:59AM |
$0.440 |
$0.400 |
fallen by
9.09%
|
|
GDM - Price-sensitive ASX Announcement
Full Release
Key Points
- GDM announces first gold pour at Challenger gold mine.
- Initial gold production achieved and marks a significant company milestone.
- Details provided on development, construction, and commissioning of the mine.
- Ongoing exploration programs aim to expand existing resource and production levels.
- Future plans include increased production and further resource definition.
- Company emphasizes operational safety and community engagement.
- Stakeholders and employees acknowledged for their contributions.
- Positioned for growth through expansion and exploration at Challenger.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Adelong Gold Limited (ADG) ORDINARY FULLY PAID |
Materials |
$24 |
ADG Celebrates First Gold Pour At Challenger
|
17 Jul 2025 8:59AM |
$0.005 |
$0.009 |
risen by
80%
|
|
ADG - Price-sensitive ASX Announcement
Full Release
Key Points
- Adelong Gold Limited (ASX: ADG) announces the first gold pour at the Challenger Processing Plant.
- The gold pour follows the successful recommissioning of the Challenger plant.
- The initial gold was produced from processing stockpiled ore.
- Management views this milestone as a key validation of the company's strategy.
- ADG is focused on optimizing plant operations and increasing gold production.
- The company plans to continue exploration and development activities at the Adelong Goldfield.
- The announcement reaffirms ADG's commitment to operational excellence and growth.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Viridis Mining and Minerals Limited (VMM) ORDINARY FULLY PAID |
Materials |
$171 |
Viridion Secures Site for REE Refining & Recycling Hub
|
17 Jul 2025 8:58AM |
$0.775 |
$2.000 |
risen by
158.06%
|
|
VMM - Price-sensitive ASX Announcement
Full Release
Key Points
- Viridis Mining and Minerals Limited has secured a strategic site in Brazil for its REE refining and recycling operations.
- The new hub will be called the Viridion REE Refining & Recycling Hub.
- The site covers 4.5 hectares and is located in the Governador Valadares region.
- The facility will process materials from the Colossus Project and third-party sources.
- The hub will incorporate advanced technologies for rare earth refining and recycling electronic waste.
- The location offers proximity to infrastructure and transportation networks.
- This development supports Viridis's strategy for vertical integration in the rare earth supply chain.
- The hub aims to minimize environmental impact and maximize resource recovery.
- Viridis expects this project to enhance the value of its rare earth resources and support renewable energy industries.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Astron Corporation Limited (ATR) ORDINARY FULLY PAID |
Materials |
$270 |
Donald Project - Contract for Water Supply Infrastructure
|
17 Jul 2025 8:57AM |
$0.790 |
$0.640 |
fallen by
18.99%
|
|
| Austco Healthcare Limited (AHC) ORDINARY FULLY PAID |
Health Care |
$146 |
Application for quotation of securities - AHC
|
17 Jul 2025 8:57AM |
$0.330 |
$0.390 |
risen by
18.18%
|
|
| Barton Gold Holdings Limited (BGD) ORDINARY FULLY PAID |
Materials |
$266 |
Completion of Additional Regional Soil Sampling Programs
|
17 Jul 2025 8:57AM |
$0.750 |
$1.115 |
risen by
48.67%
|
|