| Gemlife Communities Group (GLF) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$1,521 |
Change of Director's Interest Notice - Inderbethal Thakral
|
20 Oct 2026 8:41AM |
$4.130 |
$4.000 |
fallen by
3.15%
|
|
| Ophir High Conviction Fund (OPH) ORDINARY UNITS FULLY PAID |
Financials |
$516 |
September 2026 Webinar Summary
|
20 Oct 2026 8:41AM |
$2.250 |
$2.320 |
risen by
3.11%
|
|
| OD6 Metals Limited (OD6) ORDINARY FULLY PAID |
Materials |
$29 |
HIGH-GRADE FLUORSPAR CORRIDOR EXTENDS 350M FROM BLUE BELL
|
20 Oct 2026 8:39AM |
$0.091 |
$0.078 |
fallen by
14.29%
|
|
OD6 - Price-sensitive ASX Announcement
Full Release
Key Points
- OD6 reported that high-grade fluorspar mineralisation extends 350 metres from Blue Bell to Shannon Queen at the Quinn Fluorspar Project in Nevada.
- Reconnaissance sampling returned rock chip assays up to 95.6% CaF2, with nine of 22 samples above 59% CaF2 and four above 90% CaF2.
- Multiple fluorspar-bearing veins and associated mineralised zones were observed, with individual vein widths ranging from 10cm to several metres.
- The results expand the exploration opportunity beyond the original Blue Bell workings and build on previously reported strong channel sampling at Blue Bell.
- Blue Bell–Shannon Queen is now considered a priority exploration area alongside Horseshoe, Mammoth and Big Jim within the broader Quinn district.
- OD6 said the growing number of separate high-grade occurrences supports a preliminary hub-and-spoke development strategy for Quinn.
- The Quinn Fluorspar Project comprises 226 mining claims over about 1,890 hectares and includes more than 20 known fluorspar occurrences.
- OD6 highlighted low-impurity mineralisation and ongoing metallurgical and ore-sorting work to assess Metspar and Acidspar product potential.
- Next steps include follow-up mapping, sampling and structural interpretation at Blue Bell–Shannon Queen, broader district exploration, metallurgy work and further permitting.
- The company views Quinn as having potential to become a strategically significant domestic high-grade fluorspar source for the U.S. market.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Ophir High Conviction Fund (OPH) ORDINARY UNITS FULLY PAID |
Financials |
$516 |
Investment Update and NAV Report September 2026
|
20 Oct 2026 8:39AM |
$2.250 |
$2.320 |
risen by
3.11%
|
|
| Gratifii Limited (GTI) ORDINARY FULLY PAID |
Information Technology |
$12 |
Gratifii Signs Agreement with Qantas and Goes Live
|
20 Oct 2026 8:37AM |
$0.030 |
$0.018 |
fallen by
40%
|
|
GTI - Price-sensitive ASX Announcement
Full Release
Key Points
- Ticketmates Australia Pty Ltd, a wholly owned subsidiary of Gratifii Limited, has gone live with Qantas Frequent Flyer members through its online marketplace.
- The arrangement is a binding three-year agreement with Qantas Airways Limited.
- The marketplace delivers Ticketmates’ movies and experiences catalogue to Qantas Frequent Flyer members.
- Gratifii’s partnership with Marketplacer enabled the launch through a single API connection and expanded marketplace capabilities.
- The company said the agreement opens a major new enterprise distribution channel for its cinema and attractions network.
- Gratifii expects the deal to increase ticket volumes over the initial three-year term.
- Revenue impact cannot yet be reliably quantified because it depends on redemption volumes.
- The agreement is not subject to any material conditions precedent.
- CEO Iain Dunstan said the launch places Gratifii’s offerings in front of 18 million Qantas Frequent Flyer members.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Beetaloo Energy Australia Limited (BTL) ORDINARY FULLY PAID |
Energy |
$309 |
Appendix 5B Quarterly Cash Flow Report - 30 September
|
20 Oct 2026 8:37AM |
$0.215 |
$0.205 |
fallen by
4.65%
|
|
BTL - Price-sensitive ASX Announcement
Full Release
Key Points
- The report is an Appendix 5B quarterly cash flow report for Beetaloo Energy Australia Limited for the quarter ended 30 September 2026.
- Net cash from operating activities for the quarter was A$16.34 million.
- Operating cash inflows were mainly driven by A$18.88 million in government grants and tax incentives.
- Other operating inflows included A$1.65 million in GST refunds and fuel tax credits and A$514,895 in interest received.
- Operating cash outflows included A$1.61 million for exploration and evaluation, A$1.09 million in staff costs, and A$2.01 million in administration and corporate costs.
- Net cash used in investing activities was A$27.93 million for the quarter.
- Investing outflows were mainly A$20.59 million for exploration and evaluation and A$7.31 million for investments.
- Net cash from financing activities was A$67,606 in the quarter.
- Financing inflows included A$317,150 from exercise of options, offset by A$249,544 in transaction costs related to equity issues.
- Cash and cash equivalents at the end of the quarter were A$51.71 million, down from A$63.25 million at the beginning of the quarter.
- Payments to related parties and their associates included in operating activities were A$293,612.
- Total financing facilities at quarter end were A$80.0 million, with A$18.47 million drawn and A$61.53 million undrawn.
- The R&D facility totalled A$30 million, with A$12.45 million drawn at quarter end and intended to be repaid after receipt of the FY2025 R&D Tax Incentive refund.
- The midstream infrastructure facility totalled A$45 million, with A$2.5 million drawn and A$42.5 million available to support the Carpentaria Pilot Project.
- The performance bond facility totalled A$5 million, with about A$3.53 million in guarantees issued and outstanding.
- Total available funding was A$113.24 million, comprising quarter-end cash and unused finance facilities.
- The company estimated it had 27 quarters of funding available based on relevant outgoings.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Beetaloo Energy Australia Limited (BTL) ORDINARY FULLY PAID |
Energy |
$309 |
Quarterly Activities Report - 30 September
|
20 Oct 2026 8:37AM |
$0.215 |
$0.205 |
fallen by
4.65%
|
|
BTL - Price-sensitive ASX Announcement
Full Release
Key Points
- Carpentaria-5H completed its IP30 flow test with a peak flow rate exceeding 14 TJ/day, a 30-day average of 6.9 TJ/day and an exit rate of 6.7 TJ/day.
- Construction of the Carpentaria Gas Plant continued and was targeting commissioning and first pilot gas sales in Q4 2026.
- The Birdum Creek 2D seismic survey covering 236 kilometres across EP167 and EP168 was completed to support future horizontal well planning.
- Beetaloo Digital was launched as a wholly owned subsidiary for a proposed integrated gas-to-power and data centre development in the Northern Territory.
- The Northern Territory Government granted exclusivity over approximately 185 hectares at Weddell for Beetaloo Digital concept and pre-FEED work.
- Beetaloo Energy signed a non-binding MOU with Halliburton to assess the upstream gas resource and technical development requirements for Beetaloo Digital.
- Beetaloo Energy signed a non-binding MOU with Australian Gas Infrastructure Group to assess gas transport and associated infrastructure, including a possible 750-kilometre pipeline toward Darwin demand centres.
- The company received its FY2025 Research and Development Tax Incentive refund of approximately $19.4 million including interest.
- Total liquidity at 30 September 2026 was $113.2 million, comprising $51.7 million in cash and $61.5 million in undrawn financing facilities.
- Approximately $20.6 million of exploration expenditure was capitalised during the quarter, mainly on the Carpentaria Pilot Project and the Birdum Creek 2D Seismic Survey.
- Beetaloo Energy continued funding Territory Sands, with total loan drawdowns reaching about $7.4 million by 30 September 2026.
- The report states the company is focused on delivering the Carpentaria Pilot Project while progressing broader Beetaloo Basin development opportunities.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Clover Corporation Limited (CLV) ORDINARY FULLY PAID |
Materials |
$170 |
Change of Director's Interest Notice
|
20 Oct 2026 8:37AM |
$1.030 |
$1.015 |
fallen by
1.46%
|
|
| L1 Global Long Short Fund Limited (GLS) ORDINARY FULLY PAID |
Financials |
$1,618 |
Quarterly Report - September 2026
|
20 Oct 2026 8:35AM |
$1.810 |
$1.860 |
risen by
2.76%
|
|
| Digico Infrastructure REIT (DGT) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$1,359 |
Citi Australia Conference
|
20 Oct 2026 8:34AM |
$2.040 |
$2.430 |
risen by
19.12%
|
|
| Gemlife Communities Group (GLF) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$1,521 |
Change of Director's Interest Notice - Adrian Puljich
|
20 Oct 2026 8:33AM |
$4.130 |
$4.000 |
fallen by
3.15%
|
|
| Neu Horizon Uranium Limited (NHU) ORDINARY FULLY PAID |
Materials |
$7 |
Quarterly Activities/Appendix 5B Cash Flow Report
|
20 Oct 2026 8:32AM |
$0.065 |
$0.064 |
fallen by
1.54%
|
|
NHU - Price-sensitive ASX Announcement
Full Release
Key Points
- Announcement date is 19 October 2026.
- Neu Horizon Uranium Limited completed its first quarterly report as an ASX-listed company for the quarter ended 30 September 2026.
- The company raised A$12.0 million in its IPO and listed on the ASX in early July 2026.
- Management said IPO funds were sufficient for approximately two years of uranium exploration across Sweden and Canada.
- The ASX listing coincided with Sweden lifting its uranium exploration and mining moratorium from 1 January 2026.
- Swedish work was prioritised during the quarter across the Arvidsjaur, Krokom and Vilhelmina projects.
- NHU completed the Summer 2026 Swedish field campaign before quarter end.
- Exploration completed in Sweden included drone magnetic and radiometric surveys, heliborne TEM and magnetic surveys, RadonX radon surveys, ground radiometrics, rock chip sampling and historical drill core re-logging.
- The company acquired 8,511 line km of drone magnetic data, 395 line km of drone radiometric data and 3,397 line km of heliborne TEM and magnetic data.
- NHU deployed and recovered 2,934 RadonX detector cups across five priority Swedish permits.
- More than 120 line km of ground radiometric data were collected in Sweden.
- A total of 62 rock chip samples were submitted, with results being interpreted.
- More than 10 historical drill holes were re-logged as part of target generation.
- Data integration and interpretation were underway to define drill targets for a maiden drilling campaign planned for early 2027 at Storvallflon in the Krokom Project.
- Canadian activities were limited during the quarter as Swedish exploration took priority.
- The Canadian Woods Projects on the northern margin of the Athabasca Basin remain prospective for basement-hosted uranium mineralisation.
- Ground truthing of Canadian VTEM and radiometric anomalies and follow-up soil geochemistry are planned for Q2 2027.
- Quarterly exploration expenditure totalled A$1.188 million.
- Exploration expenditure comprised A$1.150 million in Sweden and A$38,000 in Canada.
- The company reported no mining or production activities during the quarter.
- Net cash used in operating activities was A$1.185 million.
- Net cash used in investing activities was A$1.255 million.
- Net cash used in financing activities was A$733,000.
- Cash and cash equivalents at quarter end were A$8.623 million.
- The company estimated it had 3.63 quarters of funding available based on current outgoings.
- Related party payments included A$352,000 in salaries and fees for executive and non-executive directors.
- An additional A$67,000 was paid to the CEO for capitalised exploration services.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| National Australia Bank Limited (NAB) ORDINARY FULLY PAID |
Financials |
$124,699 |
NAB simplifying operating model and improving alignment
|
20 Oct 2026 8:30AM |
$39.900 |
$40.000 |
risen by
0.25%
|
|
| Dexus Industria REIT (DXI) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$758 |
Update - Notification of buy-back - DXI
|
20 Oct 2026 8:29AM |
$2.310 |
$2.470 |
risen by
6.93%
|
|
| Nagambie Resources Limited (NAG) ORDINARY FULLY PAID |
Materials |
$15 |
ALK:Alkane Drilling Extends Gold-Antimony System at Nagambie
|
20 Oct 2026 8:29AM |
$0.018 |
$0.012 |
fallen by
33.33%
|
|
NAG - Price-sensitive ASX Announcement
Full Release
Key Points
- Alkane announced initial drilling success at the Nagambie gold-antimony project in Victoria under its earn-in agreement with Nagambie Resources Limited.
- Alkane can earn 60% in the project by sole-funding A$12.5 million over three years, with a right to move to 80% through an additional A$15 million spend.
- Drilling started in June 2026 targeting north-south C-vein orientations interpreted to host gold-antimony mineralisation.
- Three diamond holes totaling 1,868 metres had been drilled, logged and sampled at the time of the announcement.
- Initial assays confirmed the highly mineralised and continuous epizonal Au-Sb system at Nagambie.
- Key C3 intercept in ADD001 was 3.3 g/t gold and 0.7% antimony over 10.6 metres, including 17.0 g/t gold and 5.9% antimony over 1.3 metres.
- Key C2W intercepts included 1.2 g/t gold and 2.5% antimony over 9.7 metres in ADD001, 2.1 g/t gold and 0.5% antimony over 10.0 metres in ADD006, and 0.6 g/t gold and 0.8% antimony over 22.6 metres in ADD013.
- ADD013 extended the C2W mineralisation about 115 metres below previous drilling, indicating the system remains open at depth.
- The drilling also intersected broad mineralised zones outside the existing resource, including 1.8 g/t gold and 0.2% antimony over 42.0 metres in ADD001.
- Additional significant results were reported from the C2E, C1 and N1 lodes, showing multiple mineralised domains beneath the historic West Pit.
- Alkane said Nagambie appears analogous to the Costerfield gold-antimony system and could support its strategy to expand ore sources and mine life at Costerfield.
- The announcement referenced Nagambie Resources’ 2024 updated inferred resource of 539,000 tonnes at 3.3 g/t gold and 3.9% antimony, containing about 58,000 ounces of gold and 20,800 tonnes of antimony.
- The resource and current drilling are beneath the West Pit and remain open to the east, west and at depth.
- Two diamond rigs will continue drilling to test geological controls and extensions to the Nagambie epizonal Au-Sb system ahead of Alkane’s April 2027 option decision.
- Alkane noted potential for saleable gold and antimony concentrates, although this has not yet been confirmed by metallurgical test work.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Alkane Resources Ltd (ALK) ORDINARY FULLY PAID |
Materials |
$2,357 |
Alkane Drilling Extends Gold-Antimony System at Nagambie
|
20 Oct 2026 8:29AM |
$1.760 |
$1.725 |
fallen by
1.99%
|
|
ALK - Price-sensitive ASX Announcement
Full Release
Key Points
- Alkane announced initial 2026 drilling results from the Nagambie gold-antimony project in Victoria.
- The earn-in allows Alkane to spend A$12.5 million over three years to earn 60%, with an option to increase to 80% through further expenditure.
- Alkane has a 12-month option period until April 2027 during which it can withdraw from the earn-in.
- Three diamond drill holes for 1,868 metres were drilled, logged and sampled from June 2026.
- Initial drilling confirmed the highly mineralised and continuous epizonal gold-antimony system at Nagambie.
- Key C3 intercept in ADD001 was 3.3 g/t gold and 0.7% antimony over 10.6 metres including 17.0 g/t gold and 5.9% antimony over 1.3 metres.
- Key C2W intercepts included 1.2 g/t gold and 2.5% antimony over 9.7 metres in ADD001, 2.1 g/t gold and 0.5% antimony over 10.0 metres in ADD006, and 0.6 g/t gold and 0.8% antimony over 22.6 metres in ADD013.
- The C2 zone was extended around 115 metres below its previously known extent, supporting a vertical extent of more than 250 metres.
- Drilling also intersected wide mineralised zones including 1.8 g/t gold and 0.2% antimony over 42.0 metres in ADD001.
- Results supported previously identified C1, C2, C3 and N1 lodes and also identified new mineralised domains outside the 2024 inferred resource.
- Nagambie’s 2024 updated inferred mineral resource was reported by Nagambie Resources as 539,000 tonnes at 3.3 g/t gold and 3.9% antimony.
- Alkane considers Nagambie analogous to the Costerfield gold-antimony system and part of its strategy to expand ore sources and mine life in Victoria.
- Two diamond rigs will continue drilling to test extensions of the system and further north-south fault zones and wider gold zones.
- Potential for saleable gold and antimony concentrates was noted but remains subject to future metallurgical and market studies.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Dexus Convenience Retail REIT (DXC) FULLY PAID UNITS STAPLED SECURITIES |
Real Estate |
$369 |
Update - Notification of buy-back - DXC
|
20 Oct 2026 8:27AM |
$2.670 |
$2.760 |
risen by
3.37%
|
|
| Argo Global Listed Infrastructure Limited (ALI) ORDINARY FULLY PAID |
Financials |
$474 |
Weekly NTA estimate - Fri 16.10.26
|
20 Oct 2026 8:26AM |
$2.520 |
$2.510 |
fallen by
0.40%
|
|
| HUB24 Limited (HUB) ORDINARY FULLY PAID |
Financials |
$6,356 |
HUB24 Q1 FY27 Market Update
|
20 Oct 2026 8:26AM |
$64.570 |
$77.720 |
risen by
20.37%
|
|
HUB - Price-sensitive ASX Announcement
Full Release
Key Points
- ASX release dated 20 October 2026 covering HUB24 Limited’s Q1 FY27 market update.
- Total FUA was $168.6 billion at 30 September 2026, up 15% on the prior corresponding period.
- Platform FUA was $143.7 billion, up 18% on the prior corresponding period and 3% over the quarter.
- PARS FUA was $24.9 billion, up 2% on the prior corresponding period.
- Platform net inflows were $4.0 billion in Q1 FY27, down 23% on the prior corresponding period.
- Platform growth was mainly driven by net inflows, with a small $0.2 billion contribution from positive market movements.
- HUB24 said superannuation inflows were resilient, while IDPS gross and net inflows were lower than the strong prior corresponding period.
- Gross outflows in superannuation and IDPS were broadly stable year on year as a percentage of average Platform FUA.
- HUB24 ranked first for quarterly and annual net inflows for an eleventh consecutive quarter based on latest available Plan for Life data.
- Market share increased to 10.1% as at 30 June 2026 from 9.0% a year earlier, and HUB24 was ranked the sixth largest platform by FUA.
- The company signed 45 new licensee agreements during the quarter.
- Active advisers using the platform increased by 211 to 5,860, up 12% on the prior corresponding period.
- HUB24 retained the highest Net Promoter Score in the Adviser Ratings 2026 Australian Financial Advice Landscape Report.
- The platform ranked first in 9 of 11 adviser-rated capability categories.
- PARS accounts totalled 9,697, up 9% on the prior corresponding period.
- Class account numbers rose to 229,651, up 6% on the prior corresponding period.
- NowInfinity document orders increased to 244,645, up 9% on the prior corresponding period.
- Companies using Corporate Messenger increased to 964,301, up 9% on the prior corresponding period.
- HUB24 Private Invest was enhanced with greater advice fee flexibility for wholesale clients and a more streamlined experience.
- HUB24 entered a strategic relationship with Frontier Advisors and Reach Alts to broaden wholesale access to private markets.
- The company introduced new APIs for term deposits, digital consent authorisations and fee consent documents.
- HUB24 said the acquisition of HTFS Nominees Pty Limited, trustee of the HUB24 Super Fund, was progressing subject to regulatory approvals.
- myhub was being progressively rolled out, with an initial release to HUB24 platform advisers featuring an AI-powered natural language prompt.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Rapid Critical Metals Limited (RCM) ORDINARY FULLY PAID |
Materials |
$20 |
High-Grade Expansion Continues at Webbs-Exceptional Results
|
20 Oct 2026 8:25AM |
$0.027 |
$0.017 |
fallen by
37.04%
|
|
RCM - Price-sensitive ASX Announcement
Full Release
Key Points
- RCM reported high-grade silver results from the Webbs Silver Project in northern New South Wales.
- Hole WSRC0033 returned 4m at 2,089 g/t Ag (2,334 g/t AgEQ) from 24m, including 2m at 3,950 g/t Ag (4,353 g/t AgEQ).
- WSRC0033 included 1m at 6,060 g/t Ag, the highest silver grade recorded in Rapid’s drilling to date.
- Mineralisation has now been extended 300m south and 117m north beyond the current resource outline at Webbs.
- WSRC0032 confirmed the northern extension with 5m at 237 g/t Ag (326 g/t AgEQ) from 93m, including 2m at 567 g/t Ag (737 g/t AgEQ).
- WSRC0019 delivered a broad intercept of 53m at 147 g/t Ag (217 g/t AgEQ) from 127m, including 18m at 390 g/t Ag and 5m at 854 g/t Ag.
- Additional strong intercepts included WSRC0028 at 8m at 424 g/t Ag (581 g/t AgEQ), WSRC0041 at 8m at 382 g/t Ag (522 g/t AgEQ), and WSRC0053 at 27m at 137 g/t AgEQ.
- Results support a geological model of a broader mineralised corridor with stacked or parallel lodes rather than a single lode.
- The company increased to a four-rig drilling program, with two rigs at Webbs and two at Webbs Consols.
- Exploration Licence EL9950 was granted immediately south of Webbs Consols to cover southern structural extensions.
- Soil sampling identified anomalous silver extending at least 200m north of the northern drilling.
- A previously unrecognised north-west trending soil anomaly at Webbs shows about 600m of untested strike and similar soil silver response strength to the Webbs resource.
- The new Stormer prospect on EL9799, about 3km south-west of Webbs, returned four soil samples between 1.64 and 2.91 ppm Ag and is planned for a 650m phase 1 drill program.
- Further work includes more drilling, additional approvals, follow-up soil sampling and gridding, and incorporation of results into an updated Mineral Resource Estimate and Scoping Study.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| IDP Education Limited (IEL) ORDINARY FULLY PAID |
Consumer Discretionary |
$612 |
Withdrawal of resolution 4(b) from Notice of AGM
|
20 Oct 2026 8:25AM |
$2.250 |
$2.200 |
fallen by
2.22%
|
|
| Bank of Queensland Limited (BOQ) ORDINARY FULLY PAID |
Financials |
$4,625 |
Update - Notification of buy-back - BOQ
|
20 Oct 2026 8:25AM |
$6.860 |
$7.010 |
risen by
2.19%
|
|
| Worley Limited (WOR) ORDINARY FULLY PAID |
Industrials |
$4,896 |
Update - Notification of buy-back - WOR
|
20 Oct 2026 8:25AM |
$9.210 |
$10.100 |
risen by
9.66%
|
|
| Energy One Limited (EOL) ORDINARY FULLY PAID |
Information Technology |
$547 |
Chair's Address to Shareholders - AGM
|
20 Oct 2026 8:25AM |
$14.640 |
$14.090 |
fallen by
3.76%
|
|
| Waratah Minerals Limited (WTM) ORDINARY FULLY PAID |
Materials |
$297 |
Broad Shallow Gold in First Goldenclad Drillhole
|
20 Oct 2026 8:24AM |
$0.745 |
$0.765 |
risen by
2.68%
|
|
WTM - Price-sensitive ASX Announcement
Full Release
Key Points
- Waratah’s first Goldenclad drillhole GCD001 intersected 83 m at 1.27 g/t Au from 6 m below surface.
- The main higher-grade zone included 42 m at 2.23 g/t Au from 12 m, including 6 m at 3.75 g/t Au from 26 m and 8 m at 4.83 g/t Au from 46 m.
- Results reported are partial assays from the first 100 m only, with GCD001 still being drilled toward a planned depth of about 500 m.
- The mineralisation sits directly beneath historic surface workings and is associated with vein-hosted visible gold.
- Goldenclad is about 1 km along strike from Consols and adds a fourth mineralised position in a broader 6 km corridor including Spur, Consols and Ironclad.
- Waratah said the result supports its thesis of a broader linked gold system associated with structures on the margin of the Cargo Intrusive Complex.
- GCD001 was designed to confirm historical hole DDHLG-2 and extend testing to interpreted parallel lodes beneath additional workings.
- A second hole, GCD002, has been collared on the western margin of the Goldenclad trend to test the undrilled Wollard’s Reef and drill back south across the Ironclad lease.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.