| Garda Diversified Property Fund (GDF) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$222 |
AGM nominations
|
29 Sep 2026 9:03AM |
$1.040 |
$1.020 |
fallen by
1.92%
|
|
| ClearBridge Global Infrastructure Value Fund Active ETF (CUIV) |
Financials |
$695 |
Annual Report 30 June 2026
|
29 Sep 2026 9:03AM |
$1.240 |
$1.270 |
risen by
2.42%
|
|
| ClearBridge Global Infrastructure Value Fund (Hedged) Active ETF (CIVH) |
Financials |
$1,020 |
Annual Report 30 June 2026
|
29 Sep 2026 9:02AM |
$1.065 |
$1.080 |
risen by
1.41%
|
|
| Qmines Limited (QML) ORDINARY FULLY PAID |
Materials |
$52 |
Drilling Program Doubled as Mt Chalmers Barge Results Near
|
29 Sep 2026 9:01AM |
$0.072 |
$0.068 |
fallen by
5.56%
|
|
| Western Asset Enhanced Income Fund - Active ETF (FEIF) WESTERN ASSET ENHANCED INCOME FUND - ACTIVE ETF |
Financials |
$575 |
Annual Report 30 June 2026
|
29 Sep 2026 9:01AM |
$1.120 |
$1.115 |
fallen by
0.45%
|
|
| Sea Forest Limited (SEA) ORDINARY FULLY PAID |
Consumer Staple |
$75 |
Corporate Governance Statement & Appendix 4G
|
29 Sep 2026 9:00AM |
$1.550 |
$1.600 |
risen by
3.23%
|
|
| Anson Resources Limited (ASN) ORDINARY FULLY PAID |
Materials |
$60 |
Application for Additional State Mineral Rights Approved
|
29 Sep 2026 9:00AM |
$0.043 |
$0.037 |
fallen by
13.95%
|
|
ASN - Price-sensitive ASX Announcement
Full Release
Key Points
- Utah SITLA approved Anson’s application for 17 additional strategic blocks at the Green River Lithium Project.
- The new OBA lease adds about 3,958 acres or 16.02 km2 of prospective lithium-brine ground.
- The additional tenure represents a potential 18.4% increase in the project land parcel.
- All newly approved blocks are within the JORC Resource Area of Influence and are intended to be included in the next resource update.
- Anson expects to pursue a JORC resource upgrade in Q4 2026 without further exploration drilling.
- The combined OBA and FFSL lease areas are expected to add 20.78 km2 to the JORC upgrade consideration.
- An exploration target for the new lease areas was estimated at 294–311 million tonnes of brine grading 100–130 ppm lithium.
- The exploration target equates to an estimated 29,400–40,430 tonnes of lithium or 156,491–215,201 tonnes of LCE.
- The company stated the exploration target is conceptual in nature and is not a Mineral Resource.
- The existing upgraded Green River JORC Mineral Resource was stated as 145,000 tonnes of lithium and 773,000 tonnes of contained LCE.
- The resource expansion is intended to support the Definitive Feasibility Study and project funding plans for 2027.
- The announcement includes JORC Table 1 disclosures covering sampling, assay procedures, tenure, geology and future work.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Franklin Global Systematic Equity FD - Active ETF (FGSE) FRANKLIN GLOBAL SYSTEMATIC EQUITY FD - ACTIVE ETF |
Financials |
$377 |
Annual Report 30 June 2026
|
29 Sep 2026 9:00AM |
$3.690 |
$3.760 |
risen by
1.90%
|
|
| Sea Forest Limited (SEA) ORDINARY FULLY PAID |
Consumer Staple |
$75 |
2026 Annual Report
|
29 Sep 2026 8:59AM |
$1.550 |
$1.600 |
risen by
3.23%
|
|
| EMvision Medical Devices Limited (EMV) ORDINARY FULLY PAID |
Health Care |
$150 |
Date of AGM & Closing Date of Director Nominations
|
29 Sep 2026 8:58AM |
$1.700 |
$1.610 |
fallen by
5.29%
|
|
| Clearbridge Real Income Fund - Active ETF (R3AL) |
Financials |
$415 |
Annual Report 30 June 2026
|
29 Sep 2026 8:58AM |
$1.450 |
$1.470 |
risen by
1.38%
|
|
| Franklin Australian Absolute Return Bond Fund (Managed Fund) (FRAR) |
Financials |
$692 |
Annual Report 30 June 2026
|
29 Sep 2026 8:58AM |
$1.035 |
$1.030 |
fallen by
0.48%
|
|
| Pivotal Metals Limited (PVT) ORDINARY FULLY PAID |
Materials |
$17 |
Investor Presentation - Horden Lake Scoping Study
|
29 Sep 2026 8:57AM |
$0.017 |
$0.013 |
fallen by
23.53%
|
|
PVT - Price-sensitive ASX Announcement
Full Release
Key Points
- Investor presentation for Pivotal Metals Limited focused on the Horden Lake Scoping Study in Québec, Canada.
- Presentation date is September 2026, with the Scoping Study economics referenced to the ASX announcement dated 29 September 2026.
- Horden Lake is a 100%-owned advanced pre-development copper project in a Tier-1 jurisdiction.
- 2026 JORC Mineral Resource Estimate totals 52.4Mt at 1.05% CuEq for 549kt CuEq contained metal.
- Pit-constrained mineral resource is 45.5Mt at 1.07% CuEq, with an additional 6.9Mt at 0.93% CuEq outside the pit shell.
- Measured and Indicated resources total 24.3Mt at 1.17% CuEq, with Inferred resources of 28.1Mt at 0.95% CuEq.
- Production target is 34.0Mt at 0.90% CuEq processed through a 3.5Mtpa plant over about 10 years.
- Mining concept is a conventional truck-and-shovel single open pit with a life-of-mine strip ratio of 7.9:1.
- Base-case post-tax NPV7 is about A$920 million.
- Base-case post-tax IRR is about 49%, with pre-tax IRR about 56%.
- Base-case pre-production capex is A$411 million including contingency and net of estimated tax credits.
- Post-tax payback is 1.3 years from first production.
- Life-of-mine post-tax free cash flow is estimated at A$1.369 billion including capex.
- Average payable production in years 1 to 8 is 29.1kt CuEq per annum.
- Life-of-mine payable production includes 160kt copper, 20kt nickel, 1.0kt cobalt, 83koz gold, 5.875Moz silver, 29koz palladium and 3.1koz platinum.
- AISC is estimated at US$1.00/lb copper net of by-product credits.
- Copper contributes 65% of NSR by metal and 83% of NSR by concentrate, with significant by-product support from nickel and precious metals.
- Processing uses a conventional crush-grind-float flowsheet producing clean copper and nickel concentrates.
- Life-of-mine recoveries are estimated at 92% for copper and 49% for nickel, with additional recoveries for gold, silver, palladium, cobalt and platinum.
- The study assumes base-case prices including copper at US$5.50/lb and uses a 7% real discount rate.
- Spot-case economics improve to post-tax NPV7 of A$1.343 billion and post-tax IRR of 63%.
- The deposit is open at depth and along strike, with limited deep drilling and multiple undrilled EM conductors offering growth potential.
- The 2026 resource update increased the MRE by 42% and the presentation emphasises further upside from infill and extension drilling.
- Permitting and ESG positioning are presented as favourable, with the project on Crown Land in Category 3 status under the James Bay and Northern Québec Agreement.
- Baseline environmental studies and stakeholder engagement with Cree communities have commenced.
- The company states Horden Lake trades at roughly 0.02x post-tax NPV compared with selected ASX copper development peers.
- The Scoping Study is preliminary and prepared to AACE Class 5 accuracy, so it is insufficient to support Ore Reserves or guarantee economic development.
- Approximately 30% of life-of-mine NSR in the production target is derived from Inferred Mineral Resources, which carry lower geological confidence.
- Next steps include inferred resource conversion, resource growth drilling, pre-feasibility engineering, ESIA work, stakeholder engagement and assessment of funding options.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Resources & Energy Group Limited (REZ) ORDINARY FULLY PAID |
Materials |
$7 |
Goodenough Drilling Yields Multiple Gold Intercepts
|
29 Sep 2026 8:57AM |
$0.009 |
$0.008 |
fallen by
11.11%
|
|
REZ - Price-sensitive ASX Announcement
Full Release
Key Points
- REZ reported April 2026 RC drilling results from the Goodenough Prospect at the East Menzies Gold Project in Western Australia.
- The nine-hole program totalled 798 metres and targeted exploration, resource infill and database validation.
- Best result was hole 26GERC031 with 9m at 3.97 g/t Au from 141m, including 1m at 25.5 g/t Au.
- Drilling confirmed the structural interpretation of gold mineralisation within a pyritic cherty band and south-plunging hangingwall lodes.
- South-east resource verification holes 26GERC029 and 26GERC030 intersected multiple gold zones, supporting the existing resource model.
- Six holes west-northwest of the current Goodenough Mineral Resource intersected multiple near-surface gold zones.
- Hole 26GERC034 returned 2m at 2.17 g/t Au from 39m, including 1m at 3.18 g/t Au, as the best west-northwest extension result.
- A previously unassayed historical hole named Unknown1 was located and resampled, returning 5m at 3.30 g/t Au including 1m at 11.6 g/t Au.
- Unknown1 supports geological continuity toward the Four O’clock area, but its assays are not suitable for direct inclusion in a resource estimate due to QA limitations.
- REZ stated that mineralisation at Goodenough remains open at depth and to the south.
- The company completed drill database validation using newly flown LIDAR data to improve collar accuracy and geological confidence.
- Next steps are an updated JORC 2012 Mineral Resource Estimate for Goodenough and assessment of near-term development and mining restart opportunities.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| 360 Capital Mortgage REIT (TCF) ORDINARY UNITS FULLY PAID |
Financials |
$43 |
Update - Notification of buy-back - TCF
|
29 Sep 2026 8:56AM |
$4.620 |
$4.850 |
risen by
4.98%
|
|
| Mirvac Group (MGR) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$7,064 |
Update - Notification of buy-back - MGR
|
29 Sep 2026 8:56AM |
$1.750 |
$1.820 |
risen by
4%
|
|
| Tyro Payments Limited (TYR) ORDINARY FULLY PAID |
Financials |
$355 |
Resignation of Chief Financial Officer
|
29 Sep 2026 8:56AM |
$0.685 |
$0.665 |
fallen by
2.92%
|
|
| Arena REIT (ARF) FULLY PAID ORDINARY/UNITS STAPLED SECURITIES |
Real Estate |
$1,005 |
Constitution Amendments - AMIT Regime
|
29 Sep 2026 8:56AM |
$2.120 |
$2.460 |
risen by
16.04%
|
|
| Catalyst Metals Limited (CYL) ORDINARY FULLY PAID |
Materials |
$1,476 |
Catalyst grows Reserves to 2Moz across the Plutonic Belt
|
29 Sep 2026 8:55AM |
$5.660 |
$5.590 |
fallen by
1.24%
|
|
CYL - Price-sensitive ASX Announcement
Full Release
Key Points
- Catalyst announced 2.0Moz of Ore Reserves across the Plutonic Gold Belt in Western Australia.
- The Reserve base is intended to support production of about 200,000 ounces per annum for about 10 years at Plutonic.
- Total Plutonic Belt Reserves at 30 June 2026 were 23.4Mt at 2.6g/t Au for 1,971koz.
- Underground Reserves totalled 18.5Mt at 3.0g/t Au for 1,751koz and open pit Reserves totalled 4.6Mt at 1.4g/t Au for 213koz.
- Major Reserve contributors were Plutonic Main, Trident, Cinnamon, Keillor and Old Highway.
- Reserves increased 35% over the previous 12 months from 1.5Moz to 2.0Moz.
- Since acquisition, Catalyst said it has grown the Plutonic Belt Reserve base four-fold and added about 1.8Moz after depletion.
- Catalyst said more than half of Reserve growth under its ownership came from higher-grade sources including Trident, Old Highway, Cinnamon and Keillor.
- The FY2026 exploration program cost about A$80 million and targeted Reserve growth, mine life extensions and underexplored areas of the belt.
- Plutonic Belt total Mineral Resources increased to about 5.0Moz over the past 12 months.
- Trident inferred Resources were highlighted as a near-term Reserve conversion opportunity.
- Cinnamon was described as a late-2025 discovery with a maiden underground Reserve and further repeat target potential.
- Old Highway Resources increased to 313koz at 2.4g/t Au, including an underground Resource of 186koz at 4.1g/t Au, with Reserve growth potential at depth and along strike.
- Updated deposit statements included Plutonic East underground Reserve of 34koz, Keillor total Reserve of 110koz and Old Highway total Reserve of 155koz.
- Reserve estimates used a gold price assumption of A$4,500 per ounce.
- Catalyst noted that its September 2025 long-term guidance should now be viewed only as a general guide because of changes to permitting timelines, operational delays and processing capability.
- The company said it now has the deposits, infrastructure, Reserves and balance sheet to pursue its long-term Plutonic plan.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| The Hydration Pharmaceuticals Company Limited (HPC) ORDINARY FULLY PAID |
Consumer Staple |
$2 |
July and August 2026 Trading Update
|
29 Sep 2026 8:52AM |
$0.003 |
$0.003 |
fallen by
0%
|
|
HPC - Price-sensitive ASX Announcement
Full Release
Key Points
- Announcement date is 29 September 2026.
- The document is a July and August 2026 Trading Update from The Hydration Pharmaceuticals Company Limited (ASX: HPC).
- Consolidated EBITDA loss for July and August 2026 combined fell 75% year on year to A$175,090 from A$688,743.
- Hydralyte LLC EBITDA loss for the two-month period improved 98% to A$10,216 from A$468,688.
- July 2026 consolidated EBITDA loss improved to A$119,496 from A$370,679 in July 2025.
- July 2026 Hydralyte LLC EBITDA improved to a loss of A$16,271 from a loss of A$251,478 in July 2025.
- August 2026 consolidated EBITDA loss narrowed to A$55,594 from A$318,064 in August 2025.
- Hydralyte LLC achieved its maiden monthly positive EBITDA of A$6,055 in August 2026.
- August gross margin increased to 73.3% from 66.2% in August 2025.
- The company attributed the improvement to 2026 restructuring, lower operating costs, stronger gross margins and improved operating discipline.
- Management said the business achieved record contribution margin performance across July and August 2026.
- Chairman Nick Berry said the Board remains focused on maintaining operating discipline and building on the improved margin and cost structure.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Fortuna Metals Ltd (FUN) ORDINARY FULLY PAID |
Materials |
$34 |
Letter to Shareholders - Notice of Annual General Meeting
|
29 Sep 2026 8:51AM |
$0.079 |
$0.080 |
risen by
1.27%
|
|
| Franklin Global Growth Fund (Managed Fund) (FRGG) |
Financials |
$79 |
Annual Report 30 June 2026
|
29 Sep 2026 8:50AM |
$1.500 |
$1.220 |
fallen by
18.67%
|
|
| Fortuna Metals Ltd (FUN) ORDINARY FULLY PAID |
Materials |
$34 |
Notice of Annual General Meeting/Proxy Form
|
29 Sep 2026 8:49AM |
$0.079 |
$0.080 |
risen by
1.27%
|
|
| Resources & Energy Group Limited (REZ) ORDINARY FULLY PAID |
Materials |
$7 |
Appendix 4G and Governance Statement
|
29 Sep 2026 8:49AM |
$0.009 |
$0.008 |
fallen by
11.11%
|
|
| Brambles Limited (BXB) ORDINARY FULLY PAID |
Industrials |
$26,771 |
Notification of cessation of securities - BXB
|
29 Sep 2026 8:48AM |
$18.820 |
$20.160 |
risen by
7.12%
|
|