| Lion Rock Minerals Limited (LRM) ORDINARY FULLY PAID |
Materials |
$59 |
Yaounde Laboratory Commissioned as Central Hub in Cameroon
|
8 Oct 2026 8:58AM |
$0.018 |
$0.016 |
fallen by
11.11%
|
|
LRM - Price-sensitive ASX Announcement
Full Release
Key Points
- Yaoundé laboratory has been fully commissioned as Lion Rock Minerals’ central sample preparation and logistics hub in Cameroon.
- The laboratory supports parallel preparation of HMS concentrates and whole-sample splits for REE analysis at the Minta Rare Earth & Monazite Project.
- The dual-stream approach enables simultaneous mineral sands and in-situ rare earth evaluation without waiting for one stream to finish before the other begins.
- Current capacity is up to 400 sample preparations per week, based on 80 samples per day through the HMS preparation stream.
- The facility reduces bulk sample shipment, handling and logistical costs by preparing concentrates and representative splits in-country.
- The laboratory employs 13 Cameroonians, including a laboratory manager and 12 accredited technicians, building local technical capability.
- Lion Rock is implementing a Laboratory Information Management System to improve sample traceability, quality control and integration with the geological database.
- Prepared samples are dispatched under chain of custody to independent accredited laboratories including ANSTO, Light Deep Earth, Scientific Services and ALS Global.
- External analytical methods used include ICP-OES, XRF, XRD and QEMSCAN or equivalent automated mineralogy.
- The Yaoundé laboratory is supporting assay processing from the completed 761-hole Minta Est drilling campaign that generated 3,666 samples.
- VBKOM independently inspected the laboratory and endorsed it as operating in line with industry-accepted practice for preparing HMS concentrates for dispatch.
- Lion Rock said the laboratory strengthens its ability to accelerate assessment of titanium-bearing, zirconium-bearing and rare-earth-bearing mineralisation at Minta.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Trajan Group Holdings Limited (TRJ) ORDINARY FULLY PAID |
Health Care |
$41 |
Trajan ShareWise Webinar, Introduction and Trading Update
|
8 Oct 2026 8:57AM |
$0.290 |
$0.265 |
fallen by
8.62%
|
|
TRJ - Price-sensitive ASX Announcement
Full Release
Key Points
- The presentation is a ShareWise Webinar by Trajan Group Holdings Limited dated 08 October 2026 and presented by CEO and Managing Director Stephen Tomisich.
- Trajan describes itself as a global purpose-led developer and manufacturer of analytical and life science products and devices founded in 2011.
- Trajan operates across three segments: Components & Consumables at about 70% of revenue, Capital Equipment at about 30%, and Disruptive Technologies at less than 1%.
- The company has approximately 600 staff across ten manufacturing and operations sites in the US, Australia, Europe and Asia, with more than 95% of revenue generated outside Australia.
- Trajan highlighted a step-wise acquisition and integration model aimed at retaining talent, building efficiencies, controlling timing and costs, and supporting sustainable growth.
- FY26 group revenue was $161.4 million, down 3.1% from the prior comparable period.
- FY26 group nEBITDA was $13.2 million, down 14.7% from the prior comparable period.
- FY26 proforma gross margin was 38.9%, down 0.8 percentage points, while operating NPATA rose to $2.2 million.
- Cash at FY26 year end was $12.6 million and net debt was $34.6 million.
- Management said AUD appreciation in H2 FY26 negatively affected reported revenue, with about 85% of revenues derived in USD and EUR.
- H2 FY26 performance improved through Project Neptune savings, lower corporate services headcount, pricing actions from 1 January 2026 and supply chain initiatives.
- Headcount was reduced by 45.4 FTE from September to June 2026, and the group entered FY27 with under 600 FTE.
- Unaudited FY27 Q1 nEBITDA was about $3.5 million, taking rolling 12-month nEBITDA to $16.2 million.
- FY27 Q1 net revenue was up 3.8%, with Components & Consumables up 5.2%, Disruptive Technologies up 12.7% and Capital Equipment down 1.2%.
- Net debt reduced by $1.6 million in FY27 Q1.
- Trajan guided to mid-single digit organic revenue growth and double-digit nEBITDA growth for FY27 relative to the prior comparable period.
- The company said more specific FY27 revenue and nEBITDA targets would be provided at its AGM on 28 October 2026.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| MYECO Group Ltd (MCO) ORDINARY FULLY PAID |
Materials |
$10 |
Notification regarding unquoted securities - MCO
|
8 Oct 2026 8:56AM |
$0.018 |
$0.017 |
fallen by
5.56%
|
|
| Servcorp Limited (SRV) ORDINARY FULLY PAID |
Real Estate |
$533 |
Annual Report to shareholders
|
8 Oct 2026 8:55AM |
$5.570 |
$5.230 |
fallen by
6.10%
|
|
| Australian United Investment Company Limited (AUI) ORDINARY FULLY PAID |
Financials |
$2,605 |
Update - Notification of buy-back - AUI
|
8 Oct 2026 8:55AM |
$11.790 |
$11.980 |
risen by
1.61%
|
|
| NOVONIX Limited (NVX) ORDINARY FULLY PAID |
Information Technology |
$84 |
NOVONIX Achieves ISO 9001 Quality Management Certification
|
8 Oct 2026 8:53AM |
$0.093 |
$0.084 |
fallen by
9.68%
|
|
NVX - Price-sensitive ASX Announcement
Full Release
Key Points
- NOVONIX achieved ISO 9001:2015 quality management certification.
- The certification followed an independent assessment of the company’s quality management system.
- ISO 9001 confirms NOVONIX has processes and controls to consistently meet customer and regulatory requirements and support continual improvement.
- The certification is an important milestone as NOVONIX scales its Riverside facility in Chattanooga for commercial production of synthetic graphite active anode material.
- NOVONIX said robust quality management systems are important for customer qualification, supplier approval and ongoing commercial relationships.
- CEO Mike O’Kronley said the certification validates the quality infrastructure needed for reliable commercial-scale manufacturing.
- Senior Manager Meghan Vandelinder said the certification reflects a company-wide effort to embed quality into operations.
- NOVONIX noted that ISO 9001 complements but does not replace customer-specific product qualification requirements.
- The company describes itself as building a resilient North American battery materials supply chain for lithium-ion batteries.
- The announcement includes forward-looking statements and risk disclosures related to scaling, customer demand, financing, government support, intellectual property and regulatory conditions.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Brambles Limited (BXB) ORDINARY FULLY PAID |
Industrials |
$26,771 |
Notification of cessation of securities - BXB
|
8 Oct 2026 8:52AM |
$19.140 |
$20.160 |
risen by
5.33%
|
|
| Boom Logistics Limited (BOL) ORDINARY FULLY PAID |
Industrials |
$84 |
Update - Notification of buy-back - BOL
|
8 Oct 2026 8:52AM |
$2.440 |
$2.310 |
fallen by
5.33%
|
|
| Silver Mines Limited (SVL) ORDINARY FULLY PAID |
Materials |
$294 |
Date of AGM & Closing Date for Director Nominations
|
8 Oct 2026 8:51AM |
$0.130 |
$0.115 |
fallen by
11.54%
|
|
| DeSoto Resources Limited (DES) ORDINARY FULLY PAID |
Materials |
$32 |
Power Auger Program Expanded at Timbakouna
|
8 Oct 2026 8:47AM |
$0.120 |
$0.115 |
fallen by
4.17%
|
|
DES - Price-sensitive ASX Announcement
Full Release
Key Points
- DeSoto Resources Limited announced an expansion of the Timbakouna power auger program in Guinea.
- 352 power auger holes were completed at Timbakouna for a total of 3,473 metres.
- 1,403 auger samples were collected and logged from the Timbakouna program.
- A further 200 drill holes were added to the Timbakouna auger program after new targets emerged from magnetic and radiometric survey interpretation.
- The auger program is testing the weathering profile and saprolite horizon beneath lateritic cover for potential continuation of gold mineralisation.
- No assay results were reported in the announcement.
- Auger samples were scheduled for dispatch on 12 October 2026, with first assay results anticipated later in October 2026.
- Historical drilling at Timbakouna previously returned high-grade gold intercepts, including 18 metres at 11.8 g/t Au from 48 metres.
- Soil geochemistry programs were continuing at Moïko and Yarakoura following BLEG stream sediment anomalies.
- DeSoto is reviewing heliborne geophysical data from Timbakouna and Central Siguiri to refine geological and structural targets.
- The company stated that access in some areas was constrained by artisanal workings, deep pits and the rainy season.
- DeSoto said it continues discussions with the Government of Guinea regarding permitting for new and existing projects.
- The company holds approximately 1,300 square kilometres of prospective tenure across more than 22 authorisations and permits in the Siguiri Basin.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Servcorp Limited (SRV) ORDINARY FULLY PAID |
Real Estate |
$533 |
Notice of Annual General Meeting/Proxy Form
|
8 Oct 2026 8:46AM |
$5.570 |
$5.230 |
fallen by
6.10%
|
|
| Computershare Limited (CPU) ORDINARY FULLY PAID |
Industrials |
$24,263 |
Notification of cessation of securities - CPU
|
8 Oct 2026 8:45AM |
$39.930 |
$41.950 |
risen by
5.06%
|
|
| Champion Iron Limited (CIA) ORDINARY FULLY PAID |
Materials |
$1,333 |
Notification of cessation of securities - CIA
|
8 Oct 2026 8:45AM |
$3.020 |
$2.380 |
fallen by
21.19%
|
|
| Hazer Group Limited (HZR) ORDINARY FULLY PAID |
Materials |
$78 |
Letter from the CEO- HZR's Role in the Future of Steelmaking
|
8 Oct 2026 8:44AM |
$0.295 |
$0.290 |
fallen by
1.69%
|
|
| Computershare Limited (CPU) ORDINARY FULLY PAID |
Industrials |
$24,263 |
Notification regarding unquoted securities - CPU
|
8 Oct 2026 8:44AM |
$39.930 |
$41.950 |
risen by
5.06%
|
|
| Jumbo Interactive Limited (JIN) ORDINARY FULLY PAID |
Consumer Discretionary |
$378 |
Release of Voluntary Escrow Shares
|
8 Oct 2026 8:43AM |
$5.810 |
$6.010 |
risen by
3.44%
|
|
| Computershare Limited (CPU) ORDINARY FULLY PAID |
Industrials |
$24,263 |
Notification regarding unquoted securities - CPU
|
8 Oct 2026 8:43AM |
$39.930 |
$41.950 |
risen by
5.06%
|
|
| Jumbo Interactive Limited (JIN) ORDINARY FULLY PAID |
Consumer Discretionary |
$378 |
Notice of Annual General Meeting/Proxy Form
|
8 Oct 2026 8:43AM |
$5.810 |
$6.010 |
risen by
3.44%
|
|
| QBE Insurance Group Limited (QBE) ORDINARY FULLY PAID |
Financials |
$38,415 |
Notification regarding unquoted securities - QBE
|
8 Oct 2026 8:40AM |
$24.040 |
$25.710 |
risen by
6.95%
|
|
| Jumbo Interactive Limited (JIN) ORDINARY FULLY PAID |
Consumer Discretionary |
$378 |
Update - Notification of buy-back - JIN
|
8 Oct 2026 8:39AM |
$5.810 |
$6.010 |
risen by
3.44%
|
|
| REA Group Ltd (REA) ORDINARY FULLY PAID |
Communication Services |
$21,123 |
Chairman and CEO AGM Addresses and Market Update
|
8 Oct 2026 8:38AM |
$153.000 |
$161.420 |
risen by
5.50%
|
|
| Helia Group Limited (HLI) ORDINARY FULLY PAID |
Financials |
$1,427 |
Update - Notification of buy-back - HLI
|
8 Oct 2026 8:38AM |
$5.100 |
$5.230 |
risen by
2.55%
|
|
| Dynamic Metals Limited (DYM) ORDINARY FULLY PAID |
Materials |
$30 |
Fieldwork Underway Across Broader Widgiemooltha Gold Project
|
8 Oct 2026 8:37AM |
$0.560 |
$0.565 |
risen by
0.89%
|
|
DYM - Price-sensitive ASX Announcement
Full Release
Key Points
- Dynamic Metals resumed fieldwork across the broader Widgiemooltha Gold Project.
- A historic data review identified a coherent north-south gold-in-soil anomaly about 900 metres long at Princess Sally.
- Historic soil results at Princess Sally included up to 415ppb Au, 290ppb Au and 228ppb Au.
- The anomaly encompasses the historic Princess Sally gold mine.
- Dynamic completed 286 soil samples at Princess Sally using ultra-fine multi-element analysis.
- Sampling was mainly on a 50m by 50m grid with wider regional coverage on 200m by 100m spacing.
- Historic drilling has provided limited effective testing, and six historic drillholes on or near the anomaly were reportedly not assayed for gold.
- Results from the Princess Sally soil program are expected within 4–6 weeks.
- Follow-up exploration may include aircore drilling across priority targets if results support it.
- Princess Sally is part of Dynamic’s broader Widgiemooltha gold pipeline alongside Redross, Lake Zot, Little Pea and Cognac West.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Temple & Webster Group Ltd (TPW) ORDINARY FULLY PAID |
Consumer Discretionary |
$519 |
Update - Notification of buy-back - TPW
|
8 Oct 2026 8:37AM |
$4.330 |
$4.450 |
risen by
2.77%
|
|
| AusGold Limited (AUC) ORDINARY FULLY PAID |
Materials |
$717 |
Quarterly Activities/Appendix 5B Cash Flow Report
|
8 Oct 2026 8:37AM |
$1.270 |
$1.300 |
risen by
2.36%
|
|
AUC - Price-sensitive ASX Announcement
Full Release
Key Points
- Ausgold announced a binding Scheme Implementation Deed with OceanaGold Corporation under which OceanaGold proposes to acquire 100% of Ausgold by scheme of arrangement.
- The scheme consideration was 0.03365 new OceanaGold shares per Ausgold share, implying A$1.36 per share and approximately A$776 million fully diluted equity value, with a cash election alternative subject to a A$194 million maximum cash pool.
- The Ausgold Board unanimously recommended the scheme, subject to no superior proposal and a favourable independent expert report.
- Ausgold progressed development of the 100%-owned Katanning Gold Project, including early engineering, power supply works and construction of the workforce accommodation village.
- The KGP Environmental Review Document was authorised for public release by the WA EPA, the 21-day public exhibition period was completed, and Ausgold was asked to respond to submissions.
- Three new mining leases were granted, giving Ausgold granted mining leases over all areas required for KGP development.
- Central Zone step-out drilling confirmed mineralisation beyond existing resource limits, including intercepts such as 16m at 1.32g/t from 252m, 12m at 1.49g/t from 261m and 3m at 5.67g/t from 255m.
- Ausgold completed a 20,242m RC in-fill drilling program that reduced drill spacing to about 20m by 20m across the planned first two years of mine life.
- Ausgold no longer expects to update the KGP Mineral Resource Estimate or make a Final Investment Decision by the end of 2026 because of the proposed OceanaGold transaction and further drilling.
- Cash at 30 September 2026 was A$41.956 million.
- Quarterly cash outflows included A$23.385 million for exploration and evaluation, A$20.046 million for property, plant and equipment, A$2.330 million for corporate and administration, and A$1.001 million for staff costs.
- The company had an undrawn unsecured A$20 million OceanaGold loan facility at quarter end and estimated 2.4 quarters of available funding.
- Payments to related parties totalled A$305,000 for directors’ remuneration and fees.
- Ausgold had 551,838,466 fully paid ordinary shares on issue at 30 September 2026.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.